Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134J830 + (ML20134J830)
- ML20134J831 + (ML20134J831)
- ML20134J834 + (ML20134J834)
- ML20134J835 + (ML20134J835)
- TXX-4253, Responds to NRC Re Violations Noted in Insp Rept 50-445/84-21.Corrective Actions:Deficiency Rept Completed, Operator Retrained & Sys Test Engineer Counseled on Startup Administrative Procedure Requirements + (ML20134J836)
- ML20134J837 + (ML20134J837)
- BSEP-85-1445, Forwards Semiannual Radioactive Effluent Release Rept, Jan-June 1985 & Rev 4 to Offsite Dose Calculation Manual + (ML20134J840)
- ML20134J841 + (ML20134J841)
- HL-5262, Forwards Comments to 960917 NRC Ltr Re Resolution of Spent Fuel Pool Safety Issues + (ML20134J842)
- ML20134J843 + (ML20134J843)
- 05000368/LER-1996-004-01, :on 961030,deficient Failure Modes & Effects Analysis for DC Electrical Sys Resulted in Unavailability of Automatic Functions of Plant Protective Sys.Established Administrative Controls + (ML20134J844)
- ML20134J845 + (ML20134J845)
- ML20134J846 + (ML20134J846)
- 05000368/LER-1996-005, :on 961120,did Not Perform Surveillance Testing of Plant Protective Sys & post-accident Monitoring Instrumentation Due to Inadequate Procedures.Caused by Misinterpretation of TS + (ML20134J847)
- ML20134J848 + (ML20134J848)
- ML20134J850 + (ML20134J850)
- ML20134J852 + (ML20134J852)
- ML20134J855 + (ML20134J855)
- ML20134J856 + (ML20134J856)
- ML20134J857 + (ML20134J857)
- ML20134J860 + (ML20134J860)
- ML20134J861 + (ML20134J861)
- ML20134J862 + (ML20134J862)
- ML20134J863 + (ML20134J863)
- 05000245/LER-1996-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirement + (ML20134J865)
- ML20134J867 + (ML20134J867)
- ML20134J868 + (ML20134J868)
- ML20134J870 + (ML20134J870)
- ML20134J871 + (ML20134J871)
- ML20134J873 + (ML20134J873)
- ML20134J875 + (ML20134J875)
- ML20134J877 + (ML20134J877)
- ML20134J878 + (ML20134J878)
- 05000245/LER-1997-001, Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed + (ML20134J880)
- ML20134J881 + (ML20134J881)
- ML20134J882 + (ML20134J882)
- ML20134J883 + (ML20134J883)
- ML20134J884 + (ML20134J884)
- ML20134J885 + (ML20134J885)
- 05000245/LER-1997-001-02, :on 970110,liquid Radwaste Effluent Radiation Monitor Declared Inoperable Due to Leaking Automatic Isolation Valves.Valves Repaired + (ML20134J886)
- ML20134J887 + (ML20134J887)
- ML20134J889 + (ML20134J889)
- ML20134J890 + (ML20134J890)
- 05000352/LER-1996-023, :on 950403,FPS Surveillance Tests Not Performed.Caused by Personnel Error.Individuals Involved Disciplined & New Supervisor Assigned to Onsite Fire Protection Group + (ML20134J891)
- BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station + (ML20134J892)
- ML20134J893 + (ML20134J893)
- ML20134J894 + (ML20134J894)
- ML20134J895 + (ML20134J895)
- ML20134J898 + (ML20134J898)
- ML20134J899 + (ML20134J899)
- BSEP-97-0036, Responds to NRC Re Violations Noted in Insp Repts 50-325/96-16 & 50-324/96-16 on 961027-1207.Corrective Actions:Instrument Rack Related Work Suspended,Esr 96-406 & Site Procedure for Managing Outage Risk Being Revised + (ML20134J900)