Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B16158, Provides 120-day Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions + (ML20134F266)
- ML20134F268 + (ML20134F268)
- 05000395/LER-1996-007, :on 960730,determined That Itt Barton Model 763 Pressure Transmitters Safety Hazard After Previous Failures. Caused by Loose Strain Gauge Lead.Devices Returned for Analytical Testing.Also Reportable Per Part 21 + (ML20134F269)
- B15976, Responds to RAI Re Licensed Operator Ffd.Personnel & Medical Info for Operator Encl.Encl Withheld Per 10CFR2.790 + (ML20134F270)
- ML20134F272 + (ML20134F272)
- BSEP-97-0024, Responds to RAI Re Rev to TS 3.0 & 4.0 Bases on Applicability & Surveillance Requirements,Per Guidance in GL 87-09 & NUREG-1433 + (ML20134F273)
- ML20134F274 + (ML20134F274)
- ML20134F275 + (ML20134F275)
- ML20134F280 + (ML20134F280)
- HL-5254, Advises That Modified Program & Testing Schedule Will Be Submitted to NRC Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, within 180 Days + (ML20134F281)
- ML20134F282 + (ML20134F282)
- ML20134F283 + (ML20134F283)
- ML20134F284 + (ML20134F284)
- ML20134F285 + (ML20134F285)
- ML20134F286 + (ML20134F286)
- ML20134F287 + (ML20134F287)
- 05000364/LER-1985-010-01, :on 850715,during Steady State Operation, Reactor Trip Occurred Due to High Negative Flux Rate.Caused by Voltage Surge Due to Lightning.Shortly After Trip, Generator Output Breaker Opened Prematurely + (ML20134F288)
- NRC-96-0118, Responds to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (ML20134F289)
- ML20134F291 + (ML20134F291)
- ML20134F292 + (ML20134F292)
- ST-HL-AE-5488, Discusses Resolution to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Reactor Coolant Systems + (ML20134F294)
- ML20134F295 + (ML20134F295)
- ML20134F296 + (ML20134F296)
- ML20134F298 + (ML20134F298)
- ML20134F299 + (ML20134F299)
- ML20134F300 + (ML20134F300)
- ML20134F304 + (ML20134F304)
- ML20134F305 + (ML20134F305)
- AECM-85-0246, Monthly Operating Rept for Jul 1985 + (ML20134F306)
- ML20134F307 + (ML20134F307)
- ML20134F308 + (ML20134F308)
- ML20134F309 + (ML20134F309)
- JAFP-96-0439, Submit 180 Day Response to NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs + (ML20134F310)
- ML20134F311 + (ML20134F311)
- IR 05000344/1985022 + (ML20134F312)
- ML20134F313 + (ML20134F313)
- ML20134F314 + (ML20134F314)
- ML20134F317 + (ML20134F317)
- ML20134F320 + (ML20134F320)
- ML20134F321 + (ML20134F321)
- ML20134F322 + (ML20134F322)
- ML20134F323 + (ML20134F323)
- ML20134F326 + (ML20134F326)
- ML20134F327 + (ML20134F327)
- ML20134F328 + (ML20134F328)
- ML20134F329 + (ML20134F329)
- ML20134F330 + (ML20134F330)
- ML20134F331 + (ML20134F331)
- ML20134F332 + (ML20134F332)
- ML20134F333 + (ML20134F333)
- ML20134F334 + (ML20134F334)