ML20134F298
| ML20134F298 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/23/1996 |
| From: | Mccollum W DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TAC-M95255, NUDOCS 9611050143 | |
| Download: ML20134F298 (2) | |
Text
-..
-..- ~.
l ll 1
1)ukeR>wer Company WwAvR %D>u.ut, JR o:
l Catou ba Nudear Generation ikpartment lice 1%ident
/
4800 ConcordRoad (82)831d?00 Offue itst, SC29715 (803)Dia126 Fax l
Eb DUKEPOWER.
i l
October 23, 1996 l
l U.S. Nuclear Regulatory Commission Attention:
Document Control Desk l
Washington, D.C.
20555 i
Subject:
Catawba Nuclear Station, Units 2
)
Docket Nos. 50-414
(
Second Ten Year Interval Inservice Inspection Program Request For Relief,<94-05, (TAC No.
M95255) l l
Re:
NRC Letter, Dated. September 25, 1996, Request For l
Written Commitment.
l Gentlemen:
Per your request in the referenced letter, Catawba Nuclear Station commits to the following:
Catawba Nuclear Station, when deferring nozzle inspections to the end of the inspection interval, will ensure there are no more than 10 years between inspections, except where the length of the 10-year interval is adjusted in accordance with IWA-2430.
I Should there be any questions concerning this subject or should additional information be
- required, please call D. Tower at (803) 831-3419.
Very truly yours, q]I William R. McCollum, Jr g
i i
)
9611050143 961023 PDR ADOCK 05000414 O
PDR l
i l
l f
Dogument Control Desk Page 2 j
October 23, 1996 xc:
S.D.
Ebneter, Regional Administrator Region II
)
i R.J.
Freitderiberger, Senior Resident Inspector Catawba Nuclear Station i
P.S.
Tam, Senior Project Manager ONRR l
l l