OCT-31-1996 17:24 FERf11 2 DET EDISON 313 586 4208 P.02 2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 2.1 SAFETY LIMITS l

THERMAL POWER. Low Pressure or low Flow 2.1.1 THERMAL POWER shall not exceed 25% of RATED. THERMAL POWER with the reactor vessel steam dome pressure less than 785 psig or core flow less than l 101, of rated flow.  ;

I l

APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.

ACTIOy:

With THERMAL POWER exceeding 25% of RATED THERMAL POWER and the reactor vessel l steam dome pressure less than 785 psig or core flow less than 10% of rated i flow, be in at least HOT SHUTDOWh within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and comply with the requirements of Specification 6.7.1.

THERMAL POWER. Hioh Pressure and Hioh Flow

  • 1 2.1.2 The MINIMUM CRITICAL POWER RATIO (MCPR) shall not be less than the Safety Limit MCPR of 1.09 for two recirculation loop operation and shall not be less than the Safety Limit MCPR of 1.11 for single loop operation with the l

reactor vessel steam dome pressure greater than 785 psig and core flow greater than 10% of rated flow.

l APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.

l ACIION:

i With MCPR less than the Safety Limit MCPR of 1.09 for two recirculation loop '

operation or less than the Safety Limit MCPR of 1.11 for single loop operation l

and with the reactor vessel steam dome pressure greater than 785 psig and core flow greater than 10% of rated flow, be in at least HOT SHUTDOWN within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and comply with the requirements of Specification 6.7.1. '

l REACTOR COOLANT SYSTEM PRESSURE 2.1.3 The reactor coolant system pressure, as measured in the reactor vessel steam dome, shall not exceed 1325 psig.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, 3 and 4.

ACTION:

, With the reactor coolant system pressure, as measu'ed r in the reactor vessel steam dome, above 1325 psig, be in at least HOT SHUTDOWN with reactor coolant 2

system pressure less than or equal to 1325 psig within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and comply with the requirements of Specification 6.7.1.

FERMI - UNIT 2 2-1 Amendment No. # , M ,