Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133M842 + (ML20133M842)
- ML20133M844 + (ML20133M844)
- ML20133M848 + (ML20133M848)
- ML20133M851 + (ML20133M851)
- ML20133M853 + (ML20133M853)
- ML20133M854 + (ML20133M854)
- U-600268, Forwards Justification for Not Fireproofing Div 2 Switchgear Ducts Per Safe Shutdown Analysis.Adequate Justification Provided to Eliminate Need for Affected Duct Fire Wrap + (ML20133M862)
- ML20133M863 + (ML20133M863)
- ML20133M866 + (ML20133M866)
- ML20133M867 + (ML20133M867)
- ML20133M869 + (ML20133M869)
- ST-HL-AE-1304, Final Deficiency Rept Re Inadequate Flow Protection of Category I Structures.Initially Reported on 841220.Design Changes Include Installation of Watertight Door for Lower Elevation of Turbine Generator & Check Valves + (ML20133M870)
- ML20133M873 + (ML20133M873)
- ML20133M874 + (ML20133M874)
- U-600211, Requests NRC Concurrence to Terminate Overinsp Program for HVAC Duct & Duct Supports.Technical Justification & Util Answers to NRC Questions & Comments Per Encl + (ML20133M875)
- ML20133M878 + (ML20133M878)
- ML20133M879 + (ML20133M879)
- ML20133M881 + (ML20133M881)
- IR 05000155/1985011 + (ML20133M882)
- ML20133M883 + (ML20133M883)
- ML20133M884 + (ML20133M884)
- ML20133M885 + (ML20133M885)
- ML20133M887 + (ML20133M887)
- ML20133M889 + (ML20133M889)
- ML20133M891 + (ML20133M891)
- ML20133M892 + (ML20133M892)
- IR 05000528/1985024 + (ML20133M893)
- IR 05000282/1984014 + (ML20133M895)
- ML20133M896 + (ML20133M896)
- ML20133M897 + (ML20133M897)
- ML20133M898 + (ML20133M898)
- ML20133M899 + (ML20133M899)
- ML20133M900 + (ML20133M900)
- NG-85-3228, Discusses Results of Visual Insp of Core Spray Spargers During 1985 (Cycle 8) Refueling Outage,In Response to IE Bulletin 80-13.Insp & Videotape Results Demonstrate No Reportable Indications of Cracking or Structural Failure + (ML20133M901)
- ML20133M902 + (ML20133M902)
- ML20133M905 + (ML20133M905)
- ML20133M908 + (ML20133M908)
- ML20133M909 + (ML20133M909)
- PNO-I-85-082, on 851018,4 Kv nonsafety-related Electrical Breaker Exploded,Injuring Two Const Workers.Workers Taken to Hosp for Treatment.Vendor Representatives & OSHA Investigating Cause of Event + (ML20133M910)
- ML20133M911 + (ML20133M911)
- ML20133M913 + (ML20133M913)
- ST-HL-AE-1447, Forwards Response to Draft SER or FSAR Item F 3.8-2 Re Identification of Codes,Stds & Specs Applicable to Design. Changes Will Be Incorporated in Future FSAR Amend + (ML20133M914)
- ML20133M915 + (ML20133M915)
- ML20133M916 + (ML20133M916)
- ML20133M919 + (ML20133M919)
- IR 05000315/1984021 + (ML20133M923)
- ML20133M924 + (ML20133M924)
- ML20133M929 + (ML20133M929)
- ML20133M930 + (ML20133M930)
- ML20133M931 + (ML20133M931)
- ST-HL-AE-1461, Forwards Response to Draft SER or FSAR Item F 11.5-21 Re Radiation Monitoring.Changes Will Be Incorporated in Future FSAR Amend + (ML20133M932)