Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-III-85-069, on 850806,Troxler Gauge Containing 10 Mci Cs-137 & 40 Mci Am-241 Stolen from Locked Const Trailer at Site.Local Media Will Be Notified of Missing Gauge & Reward Will Be Offered for Return + (ML20133L183)
- ML20133L185 + (ML20133L185)
- ML20133L188 + (ML20133L188)
- ML20133L190 + (ML20133L190)
- ML20133L191 + (ML20133L191)
- ML20133L193 + (ML20133L193)
- ML20133L194 + (ML20133L194)
- ML20133L196 + (ML20133L196)
- ML20133L200 + (ML20133L200)
- ML20133L201 + (ML20133L201)
- 05000346/LER-1996-010, :on 961212,CREV Sys Were Not Realized as Inoperable When Radiation Monitors Were Inoperable.Caused by Misinterpretation of Relationship Between Radiation Monitors & Crevs.Standing Order 96-006 Issued + (ML20133L207)
- ML20133L208 + (ML20133L208)
- ML20133L210 + (ML20133L210)
- 05000272/LER-1985-010-01, :on 850919,discovered That Inservice Waste Gas Decay Tank Not Being Continuously Sampled for Oxygen Content as Required by Tech Specs.Caused by Incorrect Valve Lineup on 850915 Due to Personnel Error + (ML20133L212)
- ML20133L214 + (ML20133L214)
- ML20133L217 + (ML20133L217)
- ML20133L219 + (ML20133L219)
- ML20133L220 + (ML20133L220)
- 05000295/LER-1985-034-04, :on 850920,temporary Procedure Change Written for Hydrotest of Svc Water Piping to & from Containment Fan Coolers Not Reviewed Onsite within 14 Days of Initiation. Appropriate Signatures Obtained + (ML20133L221)
- ML20133L222 + (ML20133L222)
- ML20133L224 + (ML20133L224)
- ML20133L230 + (ML20133L230)
- ML20133L231 + (ML20133L231)
- ML20133L232 + (ML20133L232)
- ML20133L233 + (ML20133L233)
- ML20133L236 + (ML20133L236)
- ML20133L237 + (ML20133L237)
- ML20133L242 + (ML20133L242)
- ML20133L244 + (ML20133L244)
- 05000263/LER-1996-014-01, :on 961216,unqualified Electrical Splice Found in Train B Standby Gas Treatment Sys.Cause Appears to Be Associated with Original Plant Construction.Unqualified Splice Was Removed + (ML20133L246)
- ML20133L248 + (ML20133L248)
- ML20133L250 + (ML20133L250)
- IR 05000413/1996018 + (ML20133L252)
- ML20133L254 + (ML20133L254)
- ML20133L257 + (ML20133L257)
- ML20133L258 + (ML20133L258)
- ML20133L259 + (ML20133L259)
- ML20133L261 + (ML20133L261)
- ML20133L262 + (ML20133L262)
- ML20133L264 + (ML20133L264)
- ML20133L266 + (ML20133L266)
- B11807, Forwards Review of Integrated Safety Assessment Program Topic 1.22, Electrical Isolation, Per 850517 Commitment + (ML20133L267)
- ML20133L270 + (ML20133L270)
- ML20133L272 + (ML20133L272)
- ST-HL-AE-1320, Advises That INPO Const Project Evaluation Final Rept on File at Plant Job Site & Available for NRC Review + (ML20133L276)
- ML20133L278 + (ML20133L278)
- ML20133L281 + (ML20133L281)
- ML20133L282 + (ML20133L282)
- ML20133L283 + (ML20133L283)
- ML20133L287 + (ML20133L287)
- B11816, Submits Integrated Safety Assessment Program Topic 1.46, Determination of Safety Relief Valve Pool Dynamic Loads. GDC 50,USI A-7, Long-Term Program & USI A-39 Served as Review Criteria + (ML20133L289)