Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133K415 + (ML20133K415)
- ML20133K416 + (ML20133K416)
- ML20133K418 + (ML20133K418)
- 05000282/LER-1985-012-01, :on 850915,reactor Tripped Due to Voltage Transient During Troubleshooting.Caused by Unfamiliarity W/ Regulator.Event Will Be Discussed in Licensed Operator Requalification Program + (ML20133K419)
- ML20133K420 + (ML20133K420)
- ML20133K424 + (ML20133K424)
- ML20133K425 + (ML20133K425)
- TXX-4592, Interim Deficiency Rept SDAR-206 Re Transformers Provided by Westinghouse as Part of 480-volt Switchgear.Initially Reported on 850920.Evaluation Should Be Complete by 851203 + (ML20133K426)
- ML20133K427 + (ML20133K427)
- ST-HL-AE-1382, Interim Deficiency Rept Re Valve Installation Process Documentation.Initially Reported on 850913.Review of Documentation Being Performed to Assess Safety Impact.Next Rept Will Be Submitted Before 851221 + (ML20133K430)
- W3P85-2553, Forwards Util Austerity Program Outline for 1985 & Listing of Possible Effects on Plants.Program Does Not Adversely Impact Safety of Plant or Compliance W/Nrc Regulations + (ML20133K431)
- ML20133K433 + (ML20133K433)
- ML20133K434 + (ML20133K434)
- B11782, Requests Schedular Exemption from Requirements of 10CFR50, App A,Gdc 2 Re Seismic Interaction,Until Issuance of Full Power Ol.Exemption Requested to Allow Further Staff Review of Seismic Interaction Program + (ML20133K436)
- ML20133K438 + (ML20133K438)
- ML20133K439 + (ML20133K439)
- HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 + (ML20133K441)
- 05000366/LER-1996-004-03, :on 960917,misinterpretation of Requirements Resulted in Missed TSs Surveillance Occurred.Caused by Misinterpretation of Unit 2 TSs Surveillance.Procedure 57SV-011-2S Was Written & Approved + (ML20133K444)
- ML20133K445 + (ML20133K445)
- ML20133K448 + (ML20133K448)
- ML20133K449 + (ML20133K449)
- ML20133K450 + (ML20133K450)
- 3F0785-24, Responds to Violations Noted in Insp Rept 50-302/85-21. Corrective Actions:Procedures Revised in May 1985 to State Min Pressure of 225 Psig for Diesel Generator Air Start Sys to Reflect FSAR Commitment + (ML20133K451)
- ML20133K454 + (ML20133K454)
- ML20133K455 + (ML20133K455)
- ML20133K456 + (ML20133K456)
- ML20133K459 + (ML20133K459)
- ML20133K462 + (ML20133K462)
- 05000366/LER-1985-021-01, :on 850707,during Reactor Water Cleanup Sys Procedure,Inboard & Outboard Suction Isolation Valves Isolated.Caused by Misaligned Position Indicators.Repairs in Progress + (ML20133K463)
- ML20133K465 + (ML20133K465)
- ML20133K466 + (ML20133K466)
- ML20133K467 + (ML20133K467)
- ML20133K468 + (ML20133K468)
- ML20133K470 + (ML20133K470)
- ML20133K471 + (ML20133K471)
- ML20133K472 + (ML20133K472)
- ML20133K475 + (ML20133K475)
- ML20133K476 + (ML20133K476)
- B11802, Provides Info Re Operating Experience for ASEA-ATOM Control Blades,Per NRC Request.Mechanical & Hydraulic Compatibility of Hafnium Tipped Blades W/Std GE Control Blades Demonstrated in NRC Review + (ML20133K477)
- ML20133K478 + (ML20133K478)
- ML20133K480 + (ML20133K480)
- ML20133K483 + (ML20133K483)
- ML20133K484 + (ML20133K484)
- ML20133K485 + (ML20133K485)
- ML20133K486 + (ML20133K486)
- ML20133K488 + (ML20133K488)
- ML20133K489 + (ML20133K489)
- ML20133K490 + (ML20133K490)
- ML20133K491 + (ML20133K491)
- ML20133K492 + (ML20133K492)
- ML20133K493 + (ML20133K493)