Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133E136 + (ML20133E136)
- ML20133E137 + (ML20133E137)
- ML20133E138 + (ML20133E138)
- ML20133E140 + (ML20133E140)
- ML20133E141 + (ML20133E141)
- ML20133E142 + (ML20133E142)
- ML20133E144 + (ML20133E144)
- IR 05000206/1985018 + (ML20133E146)
- ML20133E147 + (ML20133E147)
- 05000482/LER-1985-065, :on 850905,main Turbine Trip Caused Reactor Trip,Feedwater Isolation,Auxiliary Feedwater Actuation,Steam Generator Blowdown & Sample Isolation.Caused by Faulty Control Pump Discharge Relief Valve + (ML20133E148)
- ML20133E149 + (ML20133E149)
- IR 05000528/1985018 + (ML20133E150)
- ML20133E153 + (ML20133E153)
- ML20133E154 + (ML20133E154)
- ML20133E155 + (ML20133E155)
- ML20133E157 + (ML20133E157)
- ML20133E158 + (ML20133E158)
- IR 05000298/1985016 + (ML20133E160)
- IR 05000456/1985031 + (ML20133E161)
- ML20133E162 + (ML20133E162)
- ML20133E164 + (ML20133E164)
- ML20133E165 + (ML20133E165)
- ML20133E166 + (ML20133E166)
- ML20133E167 + (ML20133E167)
- ML20133E168 + (ML20133E168)
- ML20133E169 + (ML20133E169)
- NLS8500194, Responds to NRC Re Violations Noted in Insp Rept 50-298/85-16.Corrective Actions:Qa Instructions QAI-4,QAI-5 & QAI-10 Will Be Revised to Identify Proper Distribution & Contractor Will Rereview NDE Documentation + (ML20133E171)
- ML20133E172 + (ML20133E172)
- ML20133E174 + (ML20133E174)
- ML20133E175 + (ML20133E175)
- ML20133E178 + (ML20133E178)
- ML20133E179 + (ML20133E179)
- IR 05000458/1985029 + (ML20133E181)
- ML20133E182 + (ML20133E182)
- ML20133E184 + (ML20133E184)
- ML20133E185 + (ML20133E185)
- 05000374/LER-1985-022, :on 850510,while in Cold Shutdown,Intermediate Range Monitor C Spiked High,Initiating Full Scram Signal. Caused by Equipment Failure.Intermediate Range Monitor C Bypassed & Scram Reset + (ML20133E188)
- ML20133E192 + (ML20133E192)
- ML20133E195 + (ML20133E195)
- ML20133E196 + (ML20133E196)
- ML20133E198 + (ML20133E198)
- ML20133E199 + (ML20133E199)
- ML20133E200 + (ML20133E200)
- ML20133E201 + (ML20133E201)
- ML20133E202 + (ML20133E202)
- ML20133E205 + (ML20133E205)
- ML20133E206 + (ML20133E206)
- ML20133E208 + (ML20133E208)
- ML20133E209 + (ML20133E209)
- ML20133E210 + (ML20133E210)
- IA-85-210, Responds to Appeal Re Denial of FOIA Request for E Markey Draft Ltr to Nj Palladino Concerning Investigation of Region IV Ofc.Appeal Denied & Document Withheld (Ref FOIA Exemption 5) + (ML20133E210)