Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132G930 + (ML20132G930)
- B11617, Provides Comments on Draft NUREG-0844, NRC Integrated Program for Resolution of Unresolved Safety Issues A-3,A-4 & A-5 Re Steam Generator Tube Integrity, in Response to Generic Ltr 85-02 + (ML20132G931)
- ML20132G933 + (ML20132G933)
- ML20132G935 + (ML20132G935)
- ML20132G937 + (ML20132G937)
- ML20132G938 + (ML20132G938)
- ML20132G939 + (ML20132G939)
- ML20132G942 + (ML20132G942)
- ML20132G945 + (ML20132G945)
- ML20132G946 + (ML20132G946)
- ML20132G947 + (ML20132G947)
- ML20132G948 + (ML20132G948)
- ML20132G950 + (ML20132G950)
- 05000341/LER-1985-029, :on 850628,reactor Manually Scrammed in Response to Trip of Running CRD Pump.Caused by CRD Pump Trip Due to Low Suction Pressure Transient Occurring When Torus Water Mgt Sys Valve Opened + (ML20132G953)
- ML20132G954 + (ML20132G954)
- ML20132G955 + (ML20132G955)
- 05000416/LER-1985-032, :on 850829,discovered That on 841201 & 04, Liquid Effluent Flow Rate Estimates Exceeded 4 H Frequency of Tech Specs Requirements.Caused by Late Flow Rate Measurements.Procedural Controls Revised + (ML20132G956)
- ML20132G957 + (ML20132G957)
- ML20132G958 + (ML20132G958)
- ML20132G959 + (ML20132G959)
- ML20132G960 + (ML20132G960)
- ML20132G961 + (ML20132G961)
- ML20132G962 + (ML20132G962)
- ML20132G964 + (ML20132G964)
- ML20132G965 + (ML20132G965)
- ML20132G967 + (ML20132G967)
- IR 05000443/1985017 + (ML20132G968)
- ML20132G969 + (ML20132G969)
- ML20132G972 + (ML20132G972)
- RBG-21664, Provides Final Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. All Subj Seismically Designed Piping Sys Inspected to Verify Consistency W/Design Requirements & Differences Resolved + (ML20132G977)
- ML20132G978 + (ML20132G978)
- ML20132G979 + (ML20132G979)
- ML20132G982 + (ML20132G982)
- ML20132G984 + (ML20132G984)
- VPN-081-96, Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described + (ML20132G986)
- ML20132G990 + (ML20132G990)
- ML20132G992 + (ML20132G992)
- ML20132G996 + (ML20132G996)
- ML20132G997 + (ML20132G997)
- ML20132G998 + (ML20132G998)
- ML20132G999 + (ML20132G999)
- 05000312/LER-1985-017, :on 850906,leakage Flow Path Reported in Filtration Unit of Auxiliary Bldg a Ventilation Unit.Caused by Omission of Seal Plate During Mfg.Steel Plate Welded Over Bypass Opening + (ML20132H000)
- ML20132H001 + (ML20132H001)
- ML20132H002 + (ML20132H002)
- IR 05000267/1985001 + (ML20132H003)
- ML20132H004 + (ML20132H004)
- JAFP-85-0617, Responds to NRC Re Violations Noted in Insp Rept 50-333/85-12.Corrective Actions:Alara Supervisor Counseled on ALARA Review Procedures & Personnel Reminded of Radiation Work Permit Requirements.Mr Key Control Procedure Developed + (ML20132H005)
- ML20132H007 + (ML20132H007)
- 05000416/LER-1985-025, :on 850625,during Return to Svc of Reactor Water Cleanup (RWCU) Temp Switch,Fuse Blew Causing Loss of Power to RWCU Containment Isolation Logic Relay.Caused by Jumper Shorting During Removal.Fuse Replaced + (ML20132H008)
- ML20132H010 + (ML20132H010)
- 0CAN078512, Responds to Re Proposed Rev to Emergency Plan & Procedures to Resolve Concern Over Timely Staffing of Emergency Operations Facility.Ie Support of Changes Understood + (ML20132H011)