Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132E883 + (ML20132E883)
- ML20132E886 + (ML20132E886)
- PNO-V-85-063, on 850924,reactor Tripped Due to Loss of Main Feedwater Pump.Caused by Work on Condensate Demineralizer Sys Resulting in Flow Oscillations.Reactor Will Be Taken to Mode 5 to Repair Pressurizer Safety Valves + (ML20132E888)
- ML20132E889 + (ML20132E889)
- ML20132E890 + (ML20132E890)
- ML20132E891 + (ML20132E891)
- ML20132E894 + (ML20132E894)
- ML20132E895 + (ML20132E895)
- ML20132E897 + (ML20132E897)
- ML20132E898 + (ML20132E898)
- ML20132E900 + (ML20132E900)
- ML20132E902 + (ML20132E902)
- ML20132E905 + (ML20132E905)
- ML20132E906 + (ML20132E906)
- ML20132E907 + (ML20132E907)
- ML20132E908 + (ML20132E908)
- ML20132E909 + (ML20132E909)
- ML20132E910 + (ML20132E910)
- IR 05000334/1985014 + (ML20132E911)
- ML20132E913 + (ML20132E913)
- RBG-21730, Responds to Instrumentation & Control Sys Branch Request for Addl Info Re Item 2 of Encl 2 in Tm Novak . Surveillance Test Procedures STP-2010601-210604 Will Include Provisions to Test Interlock Per SER Section 7.4.2.3 + (ML20132E914)
- ML20132E915 + (ML20132E915)
- ML20132E919 + (ML20132E919)
- ML20132E920 + (ML20132E920)
- IA-85-560, Telcon W/J Asselstine on 850809 Re Facility Allegations + (ML20132E920)
- ML20132E921 + (ML20132E921)
- ML20132E923 + (ML20132E923)
- ML20132E927 + (ML20132E927)
- ML20132E929 + (ML20132E929)
- ML20132E930 + (ML20132E930)
- ML20132E931 + (ML20132E931)
- RBG-21722, Documents Responses to NRC 850726 & 27 Telcon Requests Re Tdi Emergency Diesel Generators.Proposed Maint & Surveillance Program Described in Section 6.0 of PNL-5485 Will Be Implemented Except as Noted on Encl Table 6.3 + (ML20132E932)
- ML20132E934 + (ML20132E934)
- ML20132E936 + (ML20132E936)
- ML20132E941 + (ML20132E941)
- ST-HL-AE-5489, Responds to Violations Noted in Insp Repts 50-498/96-06 & 50-499/96-06.Corrective Actions:Verified Operability of Seal on Gate,Installed Welded Stainless Steel Wall & Determined Gate Seals Are Properly Classified as nonsafety-related + (ML20132E944)
- ML20132E947 + (ML20132E947)
- ML20132E949 + (ML20132E949)
- IA-85-638, Responds to FOIA Request for Records Re Location of Commercial & Military Reactors,Radioactive Matl Storage, Waste Disposal & Nuclear Weapons Storage Facilities in Us. Forwards NRC 1984 Annual Rept.W/O Encl + (ML20132E949)
- ML20132E950 + (ML20132E950)
- ML20132E951 + (ML20132E951)
- 05000249/LER-1985-016-07, :on 850826,equipment Attendant Observed HPCI Room Cooler Fan Breaker Emitting Smoke.Caused by Shorted Motor Contactor Coil.Coil & Auxiliary Contacts Replaced & Maint Procedure DMP 7300-5 Performed + (ML20132E952)
- ML20132E954 + (ML20132E954)
- 05000325/LER-1996-007, :on 960609,high Pressure Coolant Injection Sys Declared Inoperable Due to Steam Supply Valve Packing Leak. Refurbished Valve & Corrected Off Center Condition + (ML20132E955)
- ML20132E956 + (ML20132E956)
- ML20132E959 + (ML20132E959)
- ML20132E960 + (ML20132E960)
- ML20132E962 + (ML20132E962)
- HL-5288, Responds to NRC Re Violations Noted in Insp Repts 50-321/96-12 & 50-366/96-12.Corrective Actions:Will Evaluate Addl Criteria for Primary Containment & Primary Containment Isolation & Established Goals Re Maint Procedures + (ML20132E963)
- ML20132E964 + (ML20132E964)
- RBG-21-731, Forwards Rev to FSAR Re Provisions for Response Time Testing of safety-related Sys to Provide Consistency Between FSAR & Proposed Tech Specs.Rev Will Be Incorporated Into Future Amend + (ML20132E971)