Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B11728, Forwards Revised Response to SER Open Items 2.2 Re Diesel Generator Load Acceptance Test After Operation at No Load, Per 850905,10 & 12 Requests + (ML20132C367)
- ML20132C368 + (ML20132C368)
- ML20132C369 + (ML20132C369)
- ML20132C370 + (ML20132C370)
- RBG-22-126, Forwards Response to Sser 3,Section 13.5.2.3 & Addl Info Requested During 850912 Meeting Re Containment Venting. Containment Venting Path Meets BWR Emergency Procedure Guidelines + (ML20132C371)
- ML20132C373 + (ML20132C373)
- ML20132C374 + (ML20132C374)
- ML20132C375 + (ML20132C375)
- ML20132C376 + (ML20132C376)
- ML20132C377 + (ML20132C377)
- RBG-21-605, Discusses Editorial Clarifications to Physical Security Plan Re Use of Nuclear Security Officer Instead of Security Officer.Use of Security Officer Concurs w/10CFR73 & in No Way Decreases Response Force Capability + (ML20132C378)
- ML20132C379 + (ML20132C379)
- IR 05000619/2007005 + (ML20132C381)
- ML20132C383 + (ML20132C383)
- ML20132C384 + (ML20132C384)
- ML20132C385 + (ML20132C385)
- ML20132C386 + (ML20132C386)
- ML20132C387 + (ML20132C387)
- 3F1296-03, Monthly Operating Rept for Nov 1996 for Crystal River Unit 3 + (ML20132C388)
- IA-85-926, Forwards Rept of 840726-27 in-progress Audit Re Detailed Control Room Design Review (Dcrdr).Dcrdr Proceeding Satisfactorily.Concern Expressed Re Differences Between Unit 1 & 2 Control Rooms & Role of Human Factors Specialist + (ML20132C389)
- ML20132C389 + (ML20132C389)
- ML20132C390 + (ML20132C390)
- ML20132C391 + (ML20132C391)
- ML20132C393 + (ML20132C393)
- ML20132C394 + (ML20132C394)
- ML20132C395 + (ML20132C395)
- B11731, Forwards Addl Info Re Draft Tech Specs,Per 850906 Meeting. Encls Include Responses to Specific Tech Spec & SER Items + (ML20132C397)
- ML20132C398 + (ML20132C398)
- ML20132C399 + (ML20132C399)
- ML20132C402 + (ML20132C402)
- ML20132C403 + (ML20132C403)
- ML20132C404 + (ML20132C404)
- ML20132C405 + (ML20132C405)
- PNO-V-85-047, on 850721-22,interference Problem W/Upper Lateral Support Bumper Block Assemblies on Steam Generators Identified.Originally Discovered During Hot Functional Testing in Late 1984.Bumper Installation Modified + (ML20132C406)
- ML20132C408 + (ML20132C408)
- ML20132C409 + (ML20132C409)
- PNO-II-85-090, on 850920,false Bomb Threat Reported at Plant.Search Conducted & Empty Briefcase Found + (ML20132C412)
- B11698, Forwards Draft 3 to Rev 0 to Emergency Plan.Revised Plan, Resolving NRC Concerns,Will Be Implemented by 851015. Comments Requested by 850925 + (ML20132C415)
- ML20132C416 + (ML20132C416)
- ML20132C417 + (ML20132C417)
- ML20132C421 + (ML20132C421)
- ML20132C423 + (ML20132C423)
- ML20132C424 + (ML20132C424)
- PNO-V-85-060, on 850919,NOAA Pacific Tsunami Warning Ctr Issued Tsunami Watch Bulletin.Caused by Earthquake Northwest of Acapulco,Mexico.Watch Terminated + (ML20132C426)
- ML20132C427 + (ML20132C427)
- ML20132C429 + (ML20132C429)
- ML20132C430 + (ML20132C430)
- ML20132C431 + (ML20132C431)
- ML20132C433 + (ML20132C433)
- ML20132C435 + (ML20132C435)
- ML20132C436 + (ML20132C436)