ML20132C405

From kanterella
Jump to navigation Jump to search
Forwards Response to 961206 Telcon Re Change 37 of Revised Corporate Emergency Plan,Rev 11
ML20132C405
Person / Time
Site: Oyster Creek, Crane
Issue date: 12/11/1996
From: Rone A
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
6710-96-2411, NUDOCS 9612180328
Download: ML20132C405 (2)


Text

{{#Wiki_filter:_ _ m.._- f g i s \\ ,s j i j. i i 4 -{ GPU Nuclear,Inc. A One Upper Pond Road NUCLEAR Parsippany, NJ 070541095 hl6h107 f 1 6710-96-2411 6000- % -2986 l i. I December 11.1996 i I U.S. Nuclear Regulatory Commission Atta: Document Control Desk I Washington,DC 20555

Subject:

Three Mile Island Nuclear Station, Unit 1 (TVJ-1) , DPR-50/ Docket No. 50-289 Three Mile Isleul Nuclear Station, Unit 2 (TMI-2) DPR-73/ Docket No. 50-320 ~ ' Oyster Creck Nuclear Generating Station (OC) DPR-16/ Docket No. 50 219 Revised Corporate Emergency Plan - Revision 11 Additional RAI Response l

Dear Sirs:

i Our July 19,1996 letter requested NRC approval of the GPU Nuclear Emergency Plan, Revision i1. That submittal included a copy of the GPU Nuclear Emergency Plan, Revision 11, and an attachment that summarized the forty-three (43) changes that comprised Revision 11. Our September 10,.19% letter transmitted an additional change, for. + clarification and consistency, to be included in Revision 11. Our November 22,1996 letter transmitted our response to a request for additional information (RA1) that was discussed during a teleconference on November 18,19%. The purpose of this letter is to document further clarification to our RAI response pertaining to Change #37 that was discussed during a teleconference with NRC reviewer. Narvaez Stinson, and GPU Nuclear personnel Jeffery Grisewood, l David Barry, and Adam Miller. The attachment contains our further clarification to Change #37 as was discussed during the teleconference on December 6,1996. Si, rely Yours, / ur.Rone [! VP & Director, Nuclear Safety & Technical Services AWM - Attachment j n, .c cc: RegionI Administrator ('2 copies) ' ? Oyster Creek Senior Resident Inspector TMI Senior Resident Inspector TM1 Project Manager OC Project Manager 9612180'328 961211 PDR ADOCK 05000219 F PDR

l t l ./ h l p' Attachment for Revised Corporate Emergency Plan, Revision 11, Additional RAI Response l l Change 37 - Provide justification for deleting the reference to the Emergency Management line to GPU Headquarters. l l Response given in November 22,1996 letter - TMl maintains telephone communication throughout the entire GPU system using a company-owned microwave and fiber optics links (i.e., tie-lines) system. Access to this system is through the plant telephone system which bypasses potentially congested public use circuits. l This system would be the prefermd system to use to contact GPU Headquarters if such contact became necessary. Derefore the separate commercial Emergency Management line is no longer needed it should be noted that this Emergency Management line was never needed or used during any drill or exercise. Further clarification - GPU Headquarters will still be serviced by normal commercial telephones. Hence, if communications to GPU Headquarters were necessary, even though none is required to fully implement the Emergency Plan, there would be normal commercial telephone or the GPU telephone lines available. GPU lines are a combination of fiber optics backed up in some locations, such as TM1, by a microwave system. i a Page1of1 ,_.}}