Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132C345 + (ML20132C345)
- ML20132C346 + (ML20132C346)
- ML20132C347 + (ML20132C347)
- ML20132C348 + (ML20132C348)
- ML20132C349 + (ML20132C349)
- ML20132C350 + (ML20132C350)
- ML20132C351 + (ML20132C351)
- ML20132C352 + (ML20132C352)
- PNO-III-85-085, on 850921,unidentified,apparently Intoxicated Man Called in Bomb Threat to Util Ofc.Plant Officials & Security Notified.No Bomb Found + (ML20132C353)
- ML20132C354 + (ML20132C354)
- 05000263/LER-1985-011, :on 850624,EFT Sys Transferred to Toxic Chemical Emergency Mode as Result of Failed Sample Pump in Hydrogen Sulfide Monitor & Failed Optics Lamp in Chlorine Monitor.Sample Pump & Lamp Replaced + (ML20132C355)
- RBG-21-496, Interim Deficiency Rept DR-306 Re Nf Anchor Bolt Nuts Supplied by Itt Phillips & Mfg by United Screw.Investigation Incomplete.Next Rept Will Be Submitted by 850719 + (ML20132C358)
- ML20132C359 + (ML20132C359)
- ML20132C361 + (ML20132C361)
- ML20132C362 + (ML20132C362)
- ML20132C363 + (ML20132C363)
- ML20132C364 + (ML20132C364)
- ML20132C365 + (ML20132C365)
- ML20132C366 + (ML20132C366)
- B11728, Forwards Revised Response to SER Open Items 2.2 Re Diesel Generator Load Acceptance Test After Operation at No Load, Per 850905,10 & 12 Requests + (ML20132C367)
- ML20132C368 + (ML20132C368)
- ML20132C369 + (ML20132C369)
- ML20132C370 + (ML20132C370)
- RBG-22-126, Forwards Response to Sser 3,Section 13.5.2.3 & Addl Info Requested During 850912 Meeting Re Containment Venting. Containment Venting Path Meets BWR Emergency Procedure Guidelines + (ML20132C371)
- ML20132C373 + (ML20132C373)
- ML20132C374 + (ML20132C374)
- ML20132C375 + (ML20132C375)
- ML20132C376 + (ML20132C376)
- ML20132C377 + (ML20132C377)
- RBG-21-605, Discusses Editorial Clarifications to Physical Security Plan Re Use of Nuclear Security Officer Instead of Security Officer.Use of Security Officer Concurs w/10CFR73 & in No Way Decreases Response Force Capability + (ML20132C378)
- ML20132C379 + (ML20132C379)
- IR 05000619/2007005 + (ML20132C381)
- ML20132C383 + (ML20132C383)
- ML20132C384 + (ML20132C384)
- ML20132C385 + (ML20132C385)
- ML20132C386 + (ML20132C386)
- ML20132C387 + (ML20132C387)
- 3F1296-03, Monthly Operating Rept for Nov 1996 for Crystal River Unit 3 + (ML20132C388)
- IA-85-926, Forwards Rept of 840726-27 in-progress Audit Re Detailed Control Room Design Review (Dcrdr).Dcrdr Proceeding Satisfactorily.Concern Expressed Re Differences Between Unit 1 & 2 Control Rooms & Role of Human Factors Specialist + (ML20132C389)
- ML20132C389 + (ML20132C389)
- ML20132C390 + (ML20132C390)
- ML20132C391 + (ML20132C391)
- ML20132C393 + (ML20132C393)
- ML20132C394 + (ML20132C394)
- ML20132C395 + (ML20132C395)
- B11731, Forwards Addl Info Re Draft Tech Specs,Per 850906 Meeting. Encls Include Responses to Specific Tech Spec & SER Items + (ML20132C397)
- ML20132C398 + (ML20132C398)
- ML20132C399 + (ML20132C399)
- ML20132C402 + (ML20132C402)
- ML20132C403 + (ML20132C403)
- ML20132C404 + (ML20132C404)