Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129H509 + (ML20129H509)
- ML20129H510 + (ML20129H510)
- IR 05000156/1996001 + (ML20129H511)
- ML20129H512 + (ML20129H512)
- ML20129H513 + (ML20129H513)
- ML20129H514 + (ML20129H514)
- IR 05000348/1996007 + (ML20129H515)
- ML20129H517 + (ML20129H517)
- ML20129H518 + (ML20129H518)
- ML20129H519 + (ML20129H519)
- ML20129H520 + (ML20129H520)
- ML20129H521 + (ML20129H521)
- ML20129H522 + (ML20129H522)
- ML20129H524 + (ML20129H524)
- ML20129H525 + (ML20129H525)
- RBG-21524, Forwards Revised FSAR & Tech Specs,Updating Figure 8.3.3 for Second Level Undervoltage for Div III 4.6 Kv Bus,Per Power Sys Branch Request.Rev to FSAR Will Be Included in Future Amend + (ML20129H526)
- 05000425/LER-1996-005-02, :on 960925,pressurizer Safety Valve Were Found to Be Open at Pressures Above Setpoints.Caused by Drift in Valves.Worn Bellows & Spindles Were Replaced,Psvs Were Readjusted Valves Were reinstalled.W961024 Ltr + (ML20129H528)
- ML20129H529 + (ML20129H529)
- IR 05000266/1996004 + (ML20129H530)
- IR 05000293/1996006 + (ML20129H531)
- ML20129H533 + (ML20129H533)
- ML20129H535 + (ML20129H535)
- ML20129H537 + (ML20129H537)
- ML20129H539 + (ML20129H539)
- ML20129H540 + (ML20129H540)
- ML20129H541 + (ML20129H541)
- ML20129H542 + (ML20129H542)
- 05000362/LER-1996-005-01, :on 960928,reactor Head Vent Valve Discovered Mispostioned.Caused by Incorrect Completion of RCS post-fill Valve Alignment Procedure.Util Confirmed Review of Records That Head Vent Valve Closed + (ML20129H544)
- ML20129H545 + (ML20129H545)
- ML20129H546 + (ML20129H546)
- 05000254/LER-1996-014, Forwards LER 96-014-00.All Personnel Will Be Briefed in Event by 961215,reinforcing Expectations to Initiate Procedure Changes When Needed + (ML20129H549)
- ML20129H550 + (ML20129H550)
- ML20129H552 + (ML20129H552)
- ML20129H553 + (ML20129H553)
- ML20129H554 + (ML20129H554)
- ML20129H555 + (ML20129H555)
- 05000254/LER-1996-014-03, :on 960927,electrical Distribution Weekly Surveillance Did Not Document Voltage Verification Due to an Inadequate Procedure.Qcos 0005-06 Has Been Revised to Ensure Verification of Proper Voltages + (ML20129H556)
- ML20129H558 + (ML20129H558)
- ML20129H559 + (ML20129H559)
- ML20129H560 + (ML20129H560)
- ML20129H561 + (ML20129H561)
- ML20129H562 + (ML20129H562)
- ML20129H563 + (ML20129H563)
- ML20129H565 + (ML20129H565)
- ML20129H566 + (ML20129H566)
- ML20129H567 + (ML20129H567)
- NSD-NRC-96-4863, Forwards Proprietary & Nonproprietary Versions of Draft Sections 5 & 6 of Notrump Verification & Validation Rept Scheduled for Completion by 961017.Proprietary Portion Withheld Per 10CFR2.790 + (ML20129H568)
- ML20129H569 + (ML20129H569)
- 05000304/LER-1996-007-08, :on 960930,TS Action Statement Were Not Performed within Allowable Time Frame as Result of Mgt Deficiency.Lesson Plan Developed & Presented to All Licensed Shift Personnel + (ML20129H570)
- ML20129H571 + (ML20129H571)
- ML20129H572 + (ML20129H572)