Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128B877 + (ML20128B877)
- ML20128B878 + (ML20128B878)
- 05000298/LER-1992-019-01, :on 921230,design Deficiency W/Ac Electrical Sys Confirmed When Single Nonaccident Event Could Result in Common Mode Failure of Both Dgs.Permanent Electrical Jumper Installed in Each Breaker Trip Circuit + (ML20128B881)
- ML20128B884 + (ML20128B884)
- ML20128B885 + (ML20128B885)
- ML20128B888 + (ML20128B888)
- ML20128B889 + (ML20128B889)
- 05000336/LER-1985-007, :on 850413,engineered Safeguards Actuation Sys Actuated Closing Containment Purge Valves.Caused by Loose Plated Particulate Radiation in Radiation Monitor Causing High Level Alarm.Procedures Revised + (ML20128B890)
- ML20128B891 + (ML20128B891)
- ML20128B893 + (ML20128B893)
- ML20128B894 + (ML20128B894)
- AECM-85-0133, Part 21 & Final Deficiency Rept 85-02 Re Tdi Diesel Generator Air Start Header Check Valve Failure.Design Change Initiated to Replace Eight Existing Check Valves on Div I & II W/Appropriate Check Valves Suitable for Design + (ML20128B897)
- ML20128B898 + (ML20128B898)
- ML20128B901 + (ML20128B901)
- ML20128B903 + (ML20128B903)
- ML20128B906 + (ML20128B906)
- ML20128B908 + (ML20128B908)
- 0CAN019307, Forwards Response to NRC 921116 Request for Addl Info Re in-structure Response Spectra,Per Suppl 1 to GL 87-02. Confirms That Util Used Generic Implementation Procedure 2 Guidance to Resolve USI A-46 + (ML20128B912)
- ML20128B913 + (ML20128B913)
- IR 05000423/1985009 + (ML20128B914)
- ML20128B915 + (ML20128B915)
- ML20128B916 + (ML20128B916)
- ML20128B918 + (ML20128B918)
- ML20128B921 + (ML20128B921)
- ML20128B922 + (ML20128B922)
- ML20128B925 + (ML20128B925)
- RBG-21-319, Interim Deficiency Rept DR-307 Re Stainless Steel Olets Supplied by Hub,Inc & Mfg by Bonney Forge.Next Rept Will Be Provided by 850708 + (ML20128B926)
- ML20128B927 + (ML20128B927)
- ML20128B929 + (ML20128B929)
- RBG-38-063, Forwards Response to Notice of Violation & Proposed Imposition of Civil Penalty for Insp Rept 50-458/92-33 on 921007-16 & 19-23.Corrective Actions:Two Individuals Involved Were Body Counted & MPC Hours Assigned.Fee Paid + (ML20128B930)
- ML20128B932 + (ML20128B932)
- ML20128B936 + (ML20128B936)
- ML20128B937 + (ML20128B937)
- ML20128B938 + (ML20128B938)
- ML20128B939 + (ML20128B939)
- ML20128B940 + (ML20128B940)
- ML20128B942 + (ML20128B942)
- ML20128B946 + (ML20128B946)
- ML20128B948 + (ML20128B948)
- ML20128B949 + (ML20128B949)
- ML20128B950 + (ML20128B950)
- ML20128B952 + (ML20128B952)
- ML20128B954 + (ML20128B954)
- ML20128B955 + (ML20128B955)
- ML20128B956 + (ML20128B956)
- ML20128B957 + (ML20128B957)
- SNRC-2014, Forwards Rev 0 to Shoreham Decommissioning Project Termination Survey Plan + (ML20128B958)
- ML20128B960 + (ML20128B960)
- ML20128B961 + (ML20128B961)
- ML20128B963 + (ML20128B963)
- ML20128B964 + (ML20128B964)