Forwards Initial Preoperational Security Program Review Insp Rept 50-423/85-09 on 850211-15
ML20128B884
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/10/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20128B888 List:
References
NUDOCS 8505280099
Download: ML20128B884 (2)


See also: IR 05000423/1985009

Text

?

gDISIGNATED ORIGMAL

MAY 101985

_ccrtirtee sym Mhuzs_

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Inspection No. 50-423/85-09

This refers to the Initial Preoperational Security Program Review conducted

by Mr. William Madden of this office on_ February 11-15, 1985 at Millstone

Unit 3, Waterford, Connecticut, of activities authorized by NRC Construction

Permit No. CPPR-113 and to_the discussions of our findings held by Mr.' Madden

with Mr. E. Mroczka and other members of your staff at the conclusion of the

inspection. This also refers to'a subsequent telephone discussion between

Mr. Madden and Mrs. P. Weekley on March 7,1985.

4

The review was conducted to assess progress on the development of the Unit 3

. Physical Protection Program. Areas examined during this review are described

in the NRC Region I Inspection Report which is enclosed with this letter.

Within.these areas, the review consisted of selective examination of proposed

. plan and procedural commitments for meeting .the requirements of 10 CFR 73.55

and 10 CFR 73.67. It also included discussions with key members of the site

security organization and project engineering staff responsible for the pro-

curement and installation of security systems, equipment and facilities. The

inspector also observed licensee acceptance procedures for the turnover of some

4

~

security equipment from the contractor. Attachment I-to the enclosed inspec-

tion report contains inspector findings regarding the proposed site security

and low enriched fuel protection plans.

Attachment 2 to the enclosed report contains a listing of IE Circulars,

Bulletins and Information Notices issued since 1977 concerning security

matters. These matters should be considered by your staff in developing the

Millstone Unit 3 Physical Protection Program and will be reviewed with your

staff during future visits to the facility by NRC personnel.

Attachment I to the enclosed report contains details of your security

program that have been determined to be exempt from public disclosure in accord-

. ance with either 10 CFR 73.21 (Safeguards Information) or 10 CFR 9.5(a)(4)

(Commercial or Financial Information). Therefore, Attachment I will not be

-placed in the NRC Public Document Room and will receive limited distribution.

This letter and the remainder of the report will be placed in the Public

Document Room, in accordance with 10 CFR 2.790(a).

OFFICIAL RECORD COPY IR50-423/85-09 - 0001.0.0

05/02/85

' 8505280099 850510 3

PDR ADOCK 050

a

- _ . _ _ _ . __ - - - ---

am 3 -

.

North 2ast Nuclear Energy Company 2 NAY 101985

..

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Ifdiial' Signed By's

EichardR. Keimig

Thornas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Inspection Report Number'50-423/85-09

(Attachment I contains Safeguards Information (SGI) and

Commercial or Financial Information (C0FI)

cc w/ encl: (w/o Attachment I which contains SGI and C0FI)

V. Papadopoli, Construction Quality Assurance Supervisor

E. R.

E. J. Foster,

Mroczka, ViceofPresident,

Director GenerationNuclear Operations (Receives Safeguards Infon

Construction

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector (w/ Attachment 1)

State of Connecticut

C. Gaskin, NMSS (w/ Attachment 1)

bec w/ encl: (w/o Attachment 1, which contains SGI and C0FI).

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

DPRP Section Chief

l

l

l

t

.

l

'

C- W h

RI:DRSS R RSS I RSS

Madden /geb eimig J er

5/G/85 610-5[~ 5%edf

0FFICIAL RECORD COPY IR50-423/85-09 - 0002.0.0

05/02/85

.. . - - - .