Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127N238 + (ML20127N238)
- ML20127N239 + (ML20127N239)
- ML20127N240 + (ML20127N240)
- 05000324/LER-1992-009-03, :on 921030,continuous Fire Watch Not Established When DG Building Fire Door & Fire Detection Sys Were Inoperable.Personnel Did Not Comply W/Requirements. Review of Requirements Will Be Held by 930115 + (ML20127N242)
- ML20127N243 + (ML20127N243)
- ML20127N244 + (ML20127N244)
- ML20127N247 + (ML20127N247)
- ML20127N248 + (ML20127N248)
- ML20127N249 + (ML20127N249)
- BSEP-92-0042, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-324/92-28 & 50-325/92-28.Corrective Actions:Two Drawer GSA Approved Vault Was Moved to Area After Concern Was Raised & Safeguards Info Was Relocated to Vault + (ML20127N250)
- ML20127N252 + (ML20127N252)
- ML20127N253 + (ML20127N253)
- ML20127N254 + (ML20127N254)
- 05000458/LER-1992-001, :on 920215,loss of Power to APRMs C & G Resulted in Trip of Div I Reactor Protection Sys & Reactor Scram.Caused by High Level Alarm Relay Not Fully Seated on Base.Failed Power Supply Replaced + (ML20127N256)
- ML20127N257 + (ML20127N257)
- ML20127N258 + (ML20127N258)
- ML20127N259 + (ML20127N259)
- ML20127N261 + (ML20127N261)
- BECO-92-131, Forwards Rev 4 to Pilgrim Nuclear Power Station Procedure 8.I.1.1, Inservice Pump & Valve Testing Program. Program Addresses Anomalies Indentified in Pump & Valve Inservice Testing Program TER + (ML20127N262)
- ML20127N264 + (ML20127N264)
- ML20127N265 + (ML20127N265)
- ML20127N269 + (ML20127N269)
- ML20127N270 + (ML20127N270)
- ML20127N271 + (ML20127N271)
- ML20127N272 + (ML20127N272)
- ML20127N274 + (ML20127N274)
- IR 05000443/1992027 + (ML20127N275)
- ML20127N276 + (ML20127N276)
- L-92-055, Forwards Corrected Pages 7-5 & 7-6 of Emergency Plan,Rev 1, Submitted by Ltr Dtd 920903.Change Pages Add Training for Radiological Assessment Survey Team Inadvertently Omitted & for Decontamination Team Which Was Incorrect + (ML20127N278)
- ML20127N279 + (ML20127N279)
- ML20127N282 + (ML20127N282)
- ML20127N284 + (ML20127N284)
- ML20127N287 + (ML20127N287)
- ML20127N288 + (ML20127N288)
- ML20127N290 + (ML20127N290)
- ML20127N292 + (ML20127N292)
- ML20127N293 + (ML20127N293)
- ML20127N294 + (ML20127N294)
- ET-NRC-92-3753, Forwards Proprietary WCAP-13487,Rev 0 & Nonproprietary WCAP-13488, High Inertia Rotor... & Proprietary WCAP-13323,Rev 0 & Nonproprietary WCAP-13324,Rev 0, Phase II Wind Tunnel.... Proprietary Repts Withheld.W/O Encls + (ML20127N295)
- ML20127N296 + (ML20127N296)
- ML20127N298 + (ML20127N298)
- ML20127N299 + (ML20127N299)
- ML20127N301 + (ML20127N301)
- ML20127N302 + (ML20127N302)
- ML20127N303 + (ML20127N303)
- ML20127N304 + (ML20127N304)
- ML20127N305 + (ML20127N305)
- ML20127N306 + (ML20127N306)
- ML20127N307 + (ML20127N307)
- ML20127N308 + (ML20127N308)
- ML20127N309 + (ML20127N309)