Forwards Insp Repts 50-321/85-01 & 50-366/85-01 on 850121-25 & Notice of Violation
ML20127N309
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/15/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20127N311 List:
References
NUDOCS 8507010521
Download: ML20127N309 (2)


See also: IR 05000321/1985001

Text

-

o

  • hikiN

f .

FEB 15 2

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NOS. 50-321/85-01 AND 50-366/85-01

On January 21 - 25, 1985, NRC inspected activities authorized by NRC Operating

License No. OPR-57 and NRC License No. NPF-5 for your E. I. Hatch facility. At

the conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations of activities

in progress. The inspector also conducted independent measurements, in the

Region II Mobile Laboratory at your site, to verify your capability for analyzing

radioactive effluents and to establish and maintain standardized methodology

among regulated facilities and the NRC.

The inspection findings indicate that certain activities violated NRC require-

ments. The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and

your reply will be placed in NRC's Public Document Room upon completion of our

evaluation of the reply. If you wish to withhold information contained therein,

please notify this office by telephone and include a written application to

withhold information in your response. Such application must be consistent with

the requirements of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

ncerely,

8507010521 850215

PDR ADOCK 05000321

O PDR

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosures: (See page 2)

l

2~E'O l '

g

o

i

.

..

-Georgic Power-Company 2

Enclosures:

1. Notice of Violation

2. Inspection Report Nos. 50-321/85-01

and 50-366/85-01

cc w/encls:

J. T. Beckham, Vice President and

General Manager-Nuclear Operation '

H. C. Nix, Site General Manager

P. E. Fornel, Site QA Supervisor

L. Gucwa, Chief, Nuclear Engineer

bec w/encis:

NRC-Resident Inspector

.Hugh S. - Jordan, Executive Secretary

Document Control Desk

State of Georgia

.

RII RII RII .RII R RII

er k M i ;

GBKuzo: a WBGloersbn DMMon odery .DMCol' ins J(P ohr VP/nciera

02/O')/84 02A1)/85 02//)/85 02/ll /85 02/ /85 OE/rf/85

1 . .