ML20127N309
| ML20127N309 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/15/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20127N311 | List: |
| References | |
| NUDOCS 8507010521 | |
| Download: ML20127N309 (2) | |
See also: IR 05000321/1985001
Text
-
hikiN
o
f
.
FEB 15 2
Georgia Power Company
ATTN:
Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
REPORT NOS. 50-321/85-01 AND 50-366/85-01
On January 21 - 25, 1985, NRC inspected activities authorized by NRC Operating
License No. OPR-57 and NRC License No. NPF-5 for your E. I. Hatch facility. At
the conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations of activities
in progress.
The inspector also conducted independent measurements, in the
Region II Mobile Laboratory at your site, to verify your capability for analyzing
radioactive effluents and to establish and maintain standardized methodology
among regulated facilities and the NRC.
The inspection findings indicate that certain activities violated NRC require-
ments. The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and
your reply will be placed in NRC's Public Document Room upon completion of our
evaluation of the reply. If you wish to withhold information contained therein,
please notify this office by telephone and include a written application to
withhold information in your response. Such application must be consistent with
the requirements of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
ncerely,
8507010521 850215
ADOCK 05000321
O
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosures:
(See page 2)
l
2~E'O l '
g
o
i
.
..
-Georgic Power-Company
2
Enclosures:
1.
2.
Inspection Report Nos. 50-321/85-01
and 50-366/85-01
cc w/encls:
J. T. Beckham, Vice President and
General Manager-Nuclear Operation
'
H. C. Nix, Site General Manager
P. E. Fornel, Site QA Supervisor
L. Gucwa, Chief, Nuclear Engineer
bec w/encis:
NRC-Resident Inspector
.Hugh S. - Jordan, Executive Secretary
Document Control Desk
State of Georgia
.
RII
RII
RII
.RII
R
RII
er
k
M
J(P
i
GBKuzo: a
WBGloersbn
DMMon odery
.DMCol' ins
ohr
VP/nciera
02/O')/84
02A1)/85
02//)/85
02/ll /85
02/ /85
OE/rf/85
1
.
.