Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127L629 + (ML20127L629)
- ML20127L631 + (ML20127L631)
- IA-92-453, Package Consisting of Summary of Negotiation/Determination of Price or Cost Reasonableness & Partially Deleted Invoice/ Statement from Pharmchem Labs + (ML20127L632)
- ML20127L632 + (ML20127L632)
- ML20127L633 + (ML20127L633)
- ML20127L634 + (ML20127L634)
- ML20127L635 + (ML20127L635)
- ML20127L636 + (ML20127L636)
- ML20127L637 + (ML20127L637)
- ML20127L639 + (ML20127L639)
- ML20127L640 + (ML20127L640)
- ML20127L641 + (ML20127L641)
- ML20127L644 + (ML20127L644)
- DD-84-17, Order Affirming 840724 Directors Decision DD-84-17 Denying Bp Garde 10CFR2.206 Petition for Action Against Util Re Plant Const.Const Abandoned on 840910.No Further Enforcement Action Required.Served on 850624 + (ML20127L645)
- ML20127L646 + (ML20127L646)
- ML20127L649 + (ML20127L649)
- ML20127L652 + (ML20127L652)
- ML20127L654 + (ML20127L654)
- ML20127L655 + (ML20127L655)
- ML20127L657 + (ML20127L657)
- 05000263/LER-1992-015, :on 921021,determined That CR Ventilation & Emergency Filtration Train Radiation Detectors Outside Design Basis.Caused by Design Deficiency During Initial CR Design.Mod to Initiate Transfer Installed + (ML20127L658)
- ML20127L660 + (ML20127L660)
- ML20127L661 + (ML20127L661)
- ML20127L663 + (ML20127L663)
- ML20127L664 + (ML20127L664)
- ML20127L665 + (ML20127L665)
- ML20127L667 + (ML20127L667)
- ML20127L668 + (ML20127L668)
- TXX-9255, Forwards Changes to FSAR in Support of Licensing Unit 2. Description/Justification for Changes & Revised FSAR Drawings Changes Also Encl.Changes Will Be Incorporated in FSAR Amend 87.W/two Oversize Drawings + (ML20127L669)
- BVY-92-130, Forwards Response to Initial SALP Rept 50-271/91-99 Covering 910317-920801,per 921029 Public Meeting in Vernon,Vt. Response Withheld + (ML20127L671)
- ML20127L672 + (ML20127L672)
- ML20127L673 + (ML20127L673)
- ML20127L674 + (ML20127L674)
- ML20127L676 + (ML20127L676)
- ML20127L677 + (ML20127L677)
- ML20127L678 + (ML20127L678)
- ML20127L679 + (ML20127L679)
- ET-NRC-93-3799, Forwards Info in Response to 920721 Request for Addl Info Re Testing Program Being Conducted by Westinghouse in Support of AP600 Design + (ML20127L680)
- ML20127L681 + (ML20127L681)
- ML20127L682 + (ML20127L682)
- TXX-4496, Requests Approval to Use Visual Weld Acceptance Criteria for Facilities,Per Proposed Generic Approval of Nuclear Const Issues Group Rept, Visual Weld Acceptance Criteria for Structural Welding at Nuclear Power Plants + (ML20127L683)
- ML20127L684 + (ML20127L684)
- ML20127L685 + (ML20127L685)
- 05000325/LER-1992-027, :on 921022,found Two Performance Tests That Did Not Meet TS SRs During Review of Fire Protection Surveillances.Caused by Inadequate Technical Reviews. Periodic Test 34.4.1.4 Revised + (ML20127L686)
- ML20127L689 + (ML20127L689)
- ML20127L690 + (ML20127L690)
- ML20127L691 + (ML20127L691)
- ML20127L692 + (ML20127L692)
- ET-NRC-93-3798, Forwards Info in Response to 920901 Request for Addl Info Re Testing to Be Conducted by Westinghouse at SPES-2 Facility in Support of AP600 Design + (ML20127L693)
- ML20127L694 + (ML20127L694)
- ML20127L695 + (ML20127L695)