Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000219/LER-1976-008-03, /03L-0:on 760326,while Performing Surveillance of High Drywell Pressure Initiation of Core Spray Sys Pressure Switch RV46C Trip Point Found Less Conservative than Tech Specs Limit.Cause Not Stated.Pressure Switch Reset + (ML20126E804)
- ML20126E809 + (ML20126E809)
- ML20126E810 + (ML20126E810)
- ML20126E811 + (ML20126E811)
- 05000219/LER-1976-005-01, /01P-0:on 760303,during Diesel Generator Loading Test Procedure,Diesel Generator 2 Started in Fast Start Mode,But Did Not Develop Sufficient Voltage to Come on to 1D Bus & Assume Sequential Loads.Caused by Relay Failure + (ML20126E812)
- ML20126E814 + (ML20126E814)
- 05000219/LER-1976-004-01, /01P-0:on 760123,during Surveillance Testing, Cooling Water Pressure Found Less than Tech Specs Limit. Caused by Loss of Engine Coolant Through Radiator Tube Leak. Radiator Repaired + (ML20126E816)
- ML20126E818 + (ML20126E818)
- ML20126E819 + (ML20126E819)
- 05000219/LER-1976-001-01, /01P-0:on 760102,during Test of High Drywell Pressure Initiation of Core Spray Sys 2,high Drywell Pressure Switch RV46B Tripped at 2.75 Psig.Caused by Failure of Barton Itt Model 278 Pressure Switch + (ML20126E823)
- ML20126E824 + (ML20126E824)
- 05000219/LER-1976-002-01, /01P-0:on 760106,local Leak Rate Tests Revealed That Reactor Bldg to Torus Vacuum Breakers V-26-16 & V-26-18 Had Combined Leakage Rate in Excess of Tech Specs Limit. Cause Unknown.Valves Will Be Adjusted &/Or Repaired + (ML20126E825)
- ML20126E826 + (ML20126E826)
- ML20126E827 + (ML20126E827)
- ML20126E828 + (ML20126E828)
- ML20126E830 + (ML20126E830)
- ML20126E831 + (ML20126E831)
- ML20126E832 + (ML20126E832)
- ML20126E833 + (ML20126E833)
- ML20126E836 + (ML20126E836)
- RBG-37747, Submits Objectives to Be Fulfilled During Plant Emergency Planning Exercise to Support 930224 Exercise Date.Informs That Scenario Package Will Be Provided 60 Days Prior to Exercise Date + (ML20126E837)
- ML20126E838 + (ML20126E838)
- ML20126E840 + (ML20126E840)
- ML20126E844 + (ML20126E844)
- ML20126E845 + (ML20126E845)
- IR 05000395/1985002 + (ML20126E846)
- ML20126E847 + (ML20126E847)
- ML20126E848 + (ML20126E848)
- IR 05000443/1992028 + (ML20126E851)
- ML20126E853 + (ML20126E853)
- ML20126E854 + (ML20126E854)
- ML20126E855 + (ML20126E855)
- ML20126E857 + (ML20126E857)
- ML20126E858 + (ML20126E858)
- IA-84-650, Responds to FOIA Request for Document Authored by G Hill Submitted in Connection W/Nrc Proceeding Re Facility.Nrc Can Neither Affirm Nor Deny That Agency Has Document + (ML20126E859)
- ML20126E859 + (ML20126E859)
- ML20126E864 + (ML20126E864)
- IR 05000364/1992020 + (ML20126E868)
- ML20126E872 + (ML20126E872)
- ML20126E875 + (ML20126E875)
- ML20126E876 + (ML20126E876)
- B14319, Forwards Rev 25 to Haddam Neck Modified Amended Security Plan Per 10CFR50.54(p).Plan Withheld Per 10CFR2790(a) + (ML20126E879)
- ML20126E881 + (ML20126E881)
- ML20126E886 + (ML20126E886)
- ML20126E887 + (ML20126E887)
- ML20126E892 + (ML20126E892)
- ML20126E894 + (ML20126E894)
- ML20126E897 + (ML20126E897)
- BECO-92-135, Comments on Proposed NRC Generic Communication,Augmented Inservice Insp Requirements for Mark I & Mark II Steel Containments,Refueling Cavities & Associated Drainage Sys + (ML20126E901)
- ML20126E902 + (ML20126E902)
- ML20126E903 + (ML20126E903)