- ML20125E017 + (ML20125E017)
- ML20125E018 + (ML20125E018)
- ML20125E020 + (ML20125E020)
- ML20125E022 + (ML20125E022)
- ML20125E023 + (ML20125E023)
- 05000206/LER-1985-009-02, :on 850301,vent Noble Gas Activity Monitor Setpoint Not Reset During Planned Release.Caused by Personnel Error.Permit Format Will Be Reorganized to Direct Operator to Verify Setpoint Correct + (ML20125E025)
- B14295, Provides Results of Insp Recently Completed at Millstone Unit 2,in Accordance W/Nrc Bulletin 89-002 + (ML20125E029)
- ML20125E031 + (ML20125E031)
- ML20125E033 + (ML20125E033)
- ML20125E037 + (ML20125E037)
- ML20125E040 + (ML20125E040)
- IA-80-298, Amend 1 to License ISNM-01698,increasing Quantity of Matl Authorized for Import from France to 399.408 Kg U,Containing 312.207 Kg U-235 & 1.486 Kg Pu + (ML20125E043)
- ML20125E043 + (ML20125E043)
- IA-80-145, License for Transnuclear,Inc to Import 121.708 Kg U, Containing 96.607 Kg U-235 & 666 G Pu from France + (ML20125E046)
- ML20125E046 + (ML20125E046)
- ML20125E047 + (ML20125E047)
- 05000322/LER-1985-018, :on 850509,reactor Protection Sys Actuation Occurred Due to False High Flux Signal Causing Upscale Spike on Intermediate Range Monitor Channel D.Caused by Personnel Bumping in-core Instrument Cables + (ML20125E048)
- ML20125E050 + (ML20125E050)
- ML20125E053 + (ML20125E053)
- ML20125E055 + (ML20125E055)
- ML20125E059 + (ML20125E059)
- ML20125E061 + (ML20125E061)
- ML20125E063 + (ML20125E063)
- ML20125E064 + (ML20125E064)
- ML20125E066 + (ML20125E066)
- BECO-LTR-92-133, Monthly Operating Rept for Nov 1992 for Pilgrim Nuclear Power Plant + (ML20125E069)
- ML20125E072 + (ML20125E072)
- ML20125E077 + (ML20125E077)
- ML20125E079 + (ML20125E079)
- ML20125E083 + (ML20125E083)
- ML20125E086 + (ML20125E086)
- ML20125E089 + (ML20125E089)
- ML20125E091 + (ML20125E091)
- 05000325/LER-1979-109, Forwards LER 79-109/03L-0 + (ML20125E092)
- 05000325/LER-1979-109-03, /03L-0:on 791229,during Normal Operation,Rod Drift Alarm Annunciated Intermittently for Rod 02-31.Rod 48 Indication Was Blinking.Probably Caused by Failure of Reed Switch for Indication + (ML20125E098)
- 05000325/LER-1980-001, Forwards LER 80-001/03L-0 + (ML20125E101)
- ML20125E103 + (ML20125E103)
- 05000325/LER-1980-001-03, /03L-0:on 800102,during Normal Operation, Containment Atmospheric Monitor Had Step Increase of Approx 2%.Caused by Instrument Drift.Instrument Recalibr & Returned to Svc + (ML20125E106)
- ML20125E107 + (ML20125E107)
- 05000324/LER-1980-002, Forwards LER 80-002/03L-0 + (ML20125E111)
- ML20125E112 + (ML20125E112)
- 05000324/LER-1980-002-03, /03L-0:on 800102,during Normal Reactor Startup,Rod Sequence Control Sys Would Not Allow Rods to Be Pulled Until Rod 34-27 Was Bypassed full-in. Caused by Defective full- in Reed Switch.Switch Will Be Repaired or Replaced + (ML20125E115)
- ML20125E116 + (ML20125E116)
- NUREG/CR-1215, Forwards Draft Copy of NUREG/CR-1215, Social & Economic Effects of Accident at Tmi,Findings to Date. Groups Rept Findings in Three Categories:Individual Behavior & Attitude Impacts,Effects on Regional Economy & Institutional Effects + (ML20125E119)
- ML20125E120 + (ML20125E120)
- ML20125E122 + (ML20125E122)
- 05000325/LER-1979-100, Forwards LER 79-100/03L-0 + (ML20125E123)
- 05000325/LER-1979-100-03, /03L-0:on 791228,while Performing Visual Insp of Inaccessible Snubbers,Two Standby Gas Treatment Sys Snubbers & One Discharge from Safety Relief Valve Snubber Were Found Inoperable.Caused by Extended Shafts & Valve Body Dama + (ML20125E127)
- ML20125E128 + (ML20125E128)
- HL-3069, Monthly Operating Repts for Nov 1992 for Edwin I Hatch Nuclear Plant,Units 1 & 2 + (ML20125E131)
- ML20125E135 + (ML20125E135)