Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117E649 + (ML20117E649)
- BSEP-96-0312, Responds to NRC Re Violations Noted in Insp Repts 50-324/96-07 & 50-325/96-07.Corrective Actions:Appropriate Personnel Will Participate in Addl Training Re Emergency Classification & Exercise Weakness and Decision Making + (ML20117E652)
- 2CAN089608, Forwards TS Re Changes to ANO Unit 2 TS 3/4.6.1.3 Concerning Containment Air Locks + (ML20117E667)
- ML20117E675 + (ML20117E675)
- 05000416/LER-1985-013, :on 850403,reactor Scrammed on High Water Level During Startup Testing.Caused by Failure of Level Channel Selector Switch.Switch Replaced & Precautionary Steps Added to Operating Instructions + (ML20117E680)
- 05000325/LER-1985-015, :on 850403,05,09,10,11,17 & 30,six Automatic & Three Manual Isolations of Units 1 & 2 Common Control Bldg (Cb) HVAC Sys Occurred.Caused by Chlorination Bldg Chlorine Alarms.No Evidence of Chlorine Leaks Found + (ML20117E691)
- ML20117E695 + (ML20117E695)
- ML20117E706 + (ML20117E706)
- ML20117E719 + (ML20117E719)
- ML20117E733 + (ML20117E733)
- NSD-NRC-96-4803, Forwards Responses to NRC RAIs on AP600 Design Certification Program + (ML20117E740)
- RC-96-0054, Provides Addl Info Re Reporting of Thermal Stratification Condition in 12 Inch Residual Heat Removal Line Connecting to C Reactor Coolant loop.Non-proprietary & Proprietary Data Encl.Proprietary Encl Withheld (Ref 10CFR2.790(b)(4)) + (ML20117E742)
- ML20117E746 + (ML20117E746)
- ML20117E750 + (ML20117E750)
- NSD-NRC-96-4793, Provides Response to Second of Sample Problems for Computer Code Validation Re Containment Vessel Design for AP600. CBI Ltr Rept, Verification of CBI Axisymmetric Shell Analysis Computer Program, Encl + (ML20117E752)
- ML20117E759 + (ML20117E759)
- ML20117E782 + (ML20117E782)
- ML20117E789 + (ML20117E789)
- ML20117E810 + (ML20117E810)
- PY-CEI-NRR-2076, Rev 2 to Nonproprietary Version of Controlled Copy of Dose Calculation Data Base for Application of Revised DBA Source Term to CEI Pnpp + (ML20117E825)
- ML20117E857 + (ML20117E857)
- ML20117E873 + (ML20117E873)
- ML20117E881 + (ML20117E881)
- ML20117E882 + (ML20117E882)
- ML20117E888 + (ML20117E888)
- ML20117E904 + (ML20117E904)
- ML20117E910 + (ML20117E910)
- ML20117E943 + (ML20117E943)
- ML20117E957 + (ML20117E957)
- ML20117E974 + (ML20117E974)
- ML20117F010 + (ML20117F010)
- ML20117F015 + (ML20117F015)
- LD-95-057, Responds to Request for Addl Info Re Nonconformances Relative to Dimensions of Replacement Reactor Vessel Head Studs + (ML20117F017)
- PY-CEI-NRR-2090, Special Rept:On 960814,channel of Post Accident Monitoring Instrumentation Was Inoperable 24 H More than OOS Time Allowed by Ts.Instrumentation Has Been Repaired & Operable + (ML20117F026)
- ML20117F029 + (ML20117F029)
- NSD-NRC-96-4804, Forwards NRC Policy on Magnitude of Site Specific Seismic Analyses Ground Motion in Response to Action from 960717 Westinghouse/Nrc AP600 Meeting + (ML20117F030)
- ML20117F038 + (ML20117F038)
- ML20117F054 + (ML20117F054)
- NSD-NRC-96-4784, Forwards WCAP-14695,Rev 0 to WCAP-14694,Rev 1 to WCAP-14396, WCAP-14690,Rev 1 to WCAP-14655 & Rev Rev 1 to WCAP-14401 Re Dser Chapter 18 & NUREG-0711 Elements + (ML20117F082)
- ML20117F092 + (ML20117F092)
- ML20117F093 + (ML20117F093)
- ML20117F099 + (ML20117F099)
- ML20117F101 + (ML20117F101)
- ML20117F104 + (ML20117F104)
- ML20117F106 + (ML20117F106)
- ML20117F109 + (ML20117F109)
- ML20117F110 + (ML20117F110)
- ML20117F118 + (ML20117F118)
- ML20117F121 + (ML20117F121)
- LIC-96-0131, Requests That Date of Response to RAI on Toxic Gas Monitors Be Extended to 961015 + (ML20117F130)
- ML20117F133 + (ML20117F133)