ML20117E910

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Vogtle Electric Generating Plant Unit 2 Cycle 5 Colr
ML20117E910
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/26/1996
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117E722 List:
References
LCV-0873, LCV-873, NUDOCS 9609030171
Download: ML20117E910 (1)


Text

Georgsa Power Company 40 inverness Center Parkway 4

Post Offee Box 1295 04rmingham. Alabarna 35201 Telephone 205 877 7122 Georga Nw'er c.K.McCoy Vce Prescent Nuclear Vogtte Prosect

!!e southem electic system August 26, 1996 LCV-0873 l

Docket No. 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washingtcn, D. C, 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT CORE OPERATING LIMITS REPORT 1

In accordance with Technical Specification 6.8.1.6, Georgia Power Company hereby i

submits the enclosed revision to the Core Operating Limits Report (COLR) for Vogtle l

Electric Generating Plant - Unit 2 Cycle 5.

j Please contact this office if you have any questions.

Sincerely, C. K. McCoy CKM/HWM Enclosure cc:

Georgia Power Company i

Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle l

l 300033 gcol',

P i

I