Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 1CAN119203, Monthly Operating Rept for Oct 1992 for Ano,Unit 1 + (ML20116L936)
- ML20116L948 + (ML20116L948)
- ML20116L965 + (ML20116L965)
- ML20116L970 + (ML20116L970)
- ML20116L973 + (ML20116L973)
- ML20116L976 + (ML20116L976)
- ML20116L983 + (ML20116L983)
- ML20116L987 + (ML20116L987)
- ML20116L990 + (ML20116L990)
- ML20116M001 + (ML20116M001)
- ML20116M005 + (ML20116M005)
- ML20116M013 + (ML20116M013)
- 05000352/LER-1985-040, :on 850330,LOCA Signal Occurred During Cold Shutdown.Caused by Personnel Error.Personnel Counseled on Proper Method of Valving & Importance of Following Procedures.Surveillance Test Revised + (ML20116M016)
- NSD-NRC-96-4800, Forwards Responses to RAI & Open Items Contained in Nov 1994 Draft SER on AP600 + (ML20116M024)
- ML20116M032 + (ML20116M032)
- ML20116M055 + (ML20116M055)
- ML20116M056 + (ML20116M056)
- ML20116M058 + (ML20116M058)
- ST-HL-AE-5403, Application for Amends to Licenses NPF-76 & NPF-80,removing SR Which Refs Toxic Gas Monitoring Sys + (ML20116M060)
- ML20116M065 + (ML20116M065)
- AECM-85-0128, Remits Fee for 850311 Proposed Mods to Startup Test Program + (ML20116M066)
- 05000331/LER-1996-003, :on 960716,PCIS Groups 1-5 Isolations Occurred. Caused by Electrical Protection Assembly Breaker Trip Undervoltage.Placed Bus on Alternate Power Supply & Reset Isolations & Half Scram + (ML20116M070)
- RC-96-0210, Responds to NRC Bulletin 96-004, Chemical,Galvanic or Other Reactions in Spent Fuel Storage & Transportation Casks. Issue Not Applicable to Plant + (ML20116M072)
- 3F0896-04, Forwards 10CFR26 fitness-for Duty Program Performance Data six-month Rept for Jan-June 1996 + (ML20116M073)
- ML20116M075 + (ML20116M075)
- ML20116M077 + (ML20116M077)
- ML20116M079 + (ML20116M079)
- LIC-96-0115, Forwards Fitness-for-Duty Program Performance Data Rept for 960101-0731 + (ML20116M080)
- 3F0896-14, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05.C/As:operability Concern Resolution Initiated on 960515 & Problem Rept Initiated on 960526 to Document Failure to Use Corrective Action Process + (ML20116M081)
- 05000327/LER-1985-004-01, :on 850116,surveillance Instructions (SI) on Fire Doors Not Performed within Tech Spec Time Limits.Caused by Personnel Error.Ltr Written to Personnel Stressing Correct Performance of SIs + (ML20116M083)
- 05000413/LER-1996-007-01, :on 960718,discovered MSSV Lift Setpoint Drift. Caused by Unanticipated Interaction of Components.Adjusted & Retested Valves & Submitted Application to Amend TS to Change Tolerance to Plus or Minus 3 Percent + (ML20116M089)
- ML20116M093 + (ML20116M093)
- ML20116M094 + (ML20116M094)
- PY-CEI-NRR-2084, Forwards semi-annual fitness-for-duty Rept Jan-June 1996 + (ML20116M095)
- NSD-NRC-96-4761, Forwards,Per 960627 Phone Request,Draft of Sections 1.0,4.0 & 5.0 of AP600 Tier 1 Certified Design Matl.Info Should Be Used to Facilitate Review of AP600 Pilot ITAAC Submittal of 960604 + (ML20116M100)
- ML20116M103 + (ML20116M103)
- NSD-NRC-96-4798, Informs That Comments Provided Will Be Considered in Development of Remaining AP600 ITAAC + (ML20116M107)
- 05000368/LER-1985-008, :on 850318,degraded Penetration Fire Barrier Blockout Discovered.Condition Existed Since Initial Grout Sealing.Fire Watch Established Per Requirements of Tech Spec 3.7.11 & Void Subsequently Filled + (ML20116M108)
- ML20116M112 + (ML20116M112)
- ML20116M113 + (ML20116M113)
- ML20116M124 + (ML20116M124)
- BSEP-96-0296, Responds to NRC Ltr Which Requested That Util Confirm Commitments & Indicate Projected Completion Dates for Revising Plant UFSAR to Provide Listed Info + (ML20116M126)
- ML20116M127 + (ML20116M127)
- PY-CEI-NRR-2083, Discusses PNPPs Intent of Transfer Responsibility for Review & Approval of Procurement Documents to Centerior Supply Chain Organization.Justification & Basis Concluding That Change Satisfies 10CFR50,App B & TS Criteria Attached + (ML20116M128)
- ML20116M129 + (ML20116M129)
- ML20116M130 + (ML20116M130)
- BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 + (ML20116M139)
- PY-CEI-NRR-2085, Monthly Operating Rept for Jul 1996 for Perry Nuclear Power Plant Unit 1 + (ML20116M141)
- LIC-96-0113, Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 1 + (ML20116M142)
- ML20116M143 + (ML20116M143)
- 05000374/LER-1985-012-04, :on 850331,during Performance of RHR Injection Line Integrity Monitor Calibr & Functional Test, RHR Shutdown Cooling Isolation Occurred.Caused by Personnel Error.Personnel Will Be Trained + (ML20116M144)