Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116L461 + (ML20116L461)
- ML20116L462 + (ML20116L462)
- ML20116L465 + (ML20116L465)
- ML20116L467 + (ML20116L467)
- ML20116L469 + (ML20116L469)
- ML20116L470 + (ML20116L470)
- ML20116L492 + (ML20116L492)
- ML20116L512 + (ML20116L512)
- ML20116L526 + (ML20116L526)
- ML20116L527 + (ML20116L527)
- ML20116L538 + (ML20116L538)
- ML20116L546 + (ML20116L546)
- ML20116L554 + (ML20116L554)
- ML20116L568 + (ML20116L568)
- ML20116L579 + (ML20116L579)
- HL-5225, Forwards Response to Request for Addl Info Re Third 10-Yr Interval ISI Program for Plant + (ML20116L581)
- ML20116L585 + (ML20116L585)
- NSD-NRC-96-4795, Forwards Draft Markup of Chapter 57 of AP600 PRA Covering Internal Fire Analysis.Pra Chapter Revised to Incorporate Shutdown Fire Evaluation + (ML20116L587)
- ML20116L589 + (ML20116L589)
- ML20116L598 + (ML20116L598)
- ML20116L600 + (ML20116L600)
- 05000265/LER-1985-008-07, :on 850401,small Crack W/Water Seeping Discovered on Recirculation Weld 02M-F7.Possibly Caused by Igscc.Further Analysis of Indications Being Performed + (ML20116L602)
- ML20116L603 + (ML20116L603)
- ML20116L614 + (ML20116L614)
- ML20116L618 + (ML20116L618)
- ML20116L620 + (ML20116L620)
- RBG-42913, Application for Amend to License NPF-47,revising Primary Containment/Drywell Hydrogen Mixing Sys & Drywell Isolation Valves + (ML20116L626)
- ML20116L632 + (ML20116L632)
- ML20116L636 + (ML20116L636)
- ML20116L640 + (ML20116L640)
- ML20116L641 + (ML20116L641)
- 05000366/LER-1985-005-01, :on 850329,determined That Battery Surveillance Procedure Contained Acceptance Criteria That Did Not Satisfy Tech Specs.Caused by Procedural Inadequacy.Procedure Being Revised + (ML20116L661)
- 05000395/LER-1996-006, :on 960711,failure of Abb/Ite 27N Relays Occurred.Caused by Defective Timer Integrated Circuit U5. Identified,Replaced & Tested Subject 27N Relays & Notified Vendor of Situation + (ML20116L671)
- RBG-43153, Forwards River Bend Station 10CFR50.59 Summary Rept, Containing Brief Description of Changes to Facility & Procedures as Described in SAR + (ML20116L681)
- ML20116L684 + (ML20116L684)
- ML20116L685 + (ML20116L685)
- ML20116L687 + (ML20116L687)
- ML20116L692 + (ML20116L692)
- ML20116L721 + (ML20116L721)
- ML20116L725 + (ML20116L725)
- ML20116L729 + (ML20116L729)
- ML20116L730 + (ML20116L730)
- 05000259/LER-1984-022, :on 840512,determined That Necessary Cooling Equipment for Some Electrical Board Rooms Could Be Lost During Loca.Caused by Design Oversight on Load Shed Logic. Mods Scheduled + (ML20116L733)
- ML20116L735 + (ML20116L735)
- 05000387/LER-1985-011-01, :on 850323 & 0402,refuel Floor Radiation Monitors Tripped & Started ESF Sys.Caused by Radiographic Testing.Esf Starts Unavoidable Due to Detector Location Near Testing.Testing Suspended & HVAC Sys Restored + (ML20116L738)
- RBG-20778, Interim Deficiency Rept DR-261 Re Inconsistent Operation of Ite Rowan Auxiliary J14 Relays.Initially Reported on 850320. Auxiliary Relays Replaced & Insp Performed on All Other J14 Relays.Next Rept Expected by 850514 + (ML20116L740)
- 05000298/LER-1985-002, :on 850326,three Deficiencies Identified in Standby Gas Treatment Sys,Namely Expansion Sleeves at Fan Discharge & in Crossover Line,Supports for Crossover Duct & Housing Drains.Caused by Design Inadequacies + (ML20116L743)
- RBG-20777, Final Deficiency Rept DR-263 Re Production Test Failures of Thermocouple Extension Wire Supplied by Rockbestos Co. Initially Reported on 850322.Cable Replaced W/Cable That Successfully Passed Production Tests + (ML20116L747)
- ML20116L754 + (ML20116L754)
- 05000338/LER-1985-004-02, :on 850328,determined That Compacted Backfill Depth Over Svc Water Sys Supply & Return Piping Did Not Meet 6-ft Min Limit Required for Tornado Missile Protection. Cause Not Stated.Depth Corrected on 850329 + (ML20116L756)
- 05000341/LER-1985-001, :on 850328 & 31,reactor Protection Sys Div 1 Power Loss Occurred,Resulting in Reactor Scram.Caused by Ground Fault at Breaker A6.Breaker Replaced & Duct Leak Repaired W/Temporary Seal + (ML20116L757)