ML20116L614

From kanterella
Jump to navigation Jump to search
Forwards Pbnp Emergency Plan Exercise Scenario Conducted on 960806-07 Iaw/Ab Davis Ltr of 870316
ML20116L614
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/14/1996
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116L616 List:
References
NUDOCS 9608190122
Download: ML20116L614 (1)


Text

I l

Wisconsin Electnc POWER COMPANY 231 W Mchgan. PO Box 2046. Mdwoukee.WI 53201-2046 (414)221-2345 VPNPD-96-053 l

August 14,1996 l

Document Control Desk I

US NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Ladies /Gemlemen:

DOCKETS 50-266 AND 50-301 EMERGENCY PREPAREDNESS EXERCISE SCENAR1Q POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 In accordance with Mr. A. Ben Davis' letter of March 16,1987, a complete copy of the Point Beach Nuclear Plant Emergency Plan Exercise Scenario is provided for your records. The exercise was conducted on August 6-7,1996. For your information, a copy of the scenario was provided to the exercise inspection team.

Please address any questions regarding this matter directly to our Emergency Preparedness Coordinator, Renee Milner at (414)755-6591.

Sincerely, m R.ctwK i

I Lmk Vice President Nuclear Power RCM/smb l

Enclosure l

l cc:

NRC Resident Inspector (w/o/e)"

I i

NRC Regional Administrator, Region III*

1 bJb I

9608190122 960814 PDR ADOCK 05000266 F

PDR

.4subsWan ofMimmEmgrOvywatim

~

POINT BEACH NUCLEAR PLANT INGESTION PATHWAY EXERCISE AUGUST 6 & 7,1996 State of Wisconsin Manitowoc County Kewaunee County

> QD;> Other Ingestion Counties t

Nuclear Regulatory i,_

Commission

_,i

/'-

V

/

Wisconsin Electric FEMA BUILDING THE FUTURE TOGETHER i

_