Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115J673 + (ML20115J673)
- ML20115J675 + (ML20115J675)
- ML20115J683 + (ML20115J683)
- ML20115J692 + (ML20115J692)
- 05000362/LER-1985-003-02, :on 850312,water Found in Resistance Temp Detector 3TE-0112-1.Caused by Small Leak in Thermowell. Detector Removed from Thermowell & Installed in Spare Thermowell.Thermowell Plugged & Seal Welded + (ML20115J697)
- ML20115J707 + (ML20115J707)
- ML20115J721 + (ML20115J721)
- ML20115J725 + (ML20115J725)
- 05000302/LER-1996-012-01, Forwards Suppl to LER 96-012-01 to Reflect Decision by FPC to Increase Total Number of Battery Chargers Tested by Mfg by One Addl Battery Charger + (ML20115J734)
- L-85-146, Special Rept:On 850308,diesel Driven Fire Pump Declared Out of Svc as Result of Inoperable Immersion Heater in Diesel Cooling Sys.Caused by Defective Thermostat Switch.Immersion Heater Assembly Replaced + (ML20115J737)
- ML20115J748 + (ML20115J748)
- ML20115J765 + (ML20115J765)
- DCL-85-152, Forwards Responses to Allegations Re Cardinal Industrial Products,Contained in Affidavits Attached as Exhibits 4 & 10 to Gap 850314 Petition.Responses to Other Petition Allegations Will Be Forwarded Later + (ML20115J770)
- ML20115J780 + (ML20115J780)
- ML20115J790 + (ML20115J790)
- ML20115J791 + (ML20115J791)
- ML20115J795 + (ML20115J795)
- BECO-85-079, Application to Amend License DPR-35,consisting of Rev 1 to 840324 Proposed Change 84-01,changing Tech Specs to Remove Details of ASME Section XI Inservice Insp Program + (ML20115J812)
- ML20115J824 + (ML20115J824)
- ML20115J825 + (ML20115J825)
- ML20115J842 + (ML20115J842)
- ML20115J853 + (ML20115J853)
- ML20115J855 + (ML20115J855)
- ML20115J870 + (ML20115J870)
- ML20115J874 + (ML20115J874)
- RBG-43101, Concurs W/Commitment Wording & Accepts Commitment Described in NRC Insp Rept 50-458/96-11 + (ML20115J878)
- ML20115J879 + (ML20115J879)
- LIC-96-0094, Forwards 1996/1997 Statement of Cash Flow from Operations as Guarantee of Payment of Deferred Premiums for Period of 960630-970630 + (ML20115J904)
- ML20115J920 + (ML20115J920)
- ML20115J924 + (ML20115J924)
- ML20115J941 + (ML20115J941)
- ML20115J945 + (ML20115J945)
- ML20115J948 + (ML20115J948)
- ML20115J952 + (ML20115J952)
- ML20115J953 + (ML20115J953)
- RBG-20638, Forwards Response to NRC 850318 Request for Addl Info Re Emergency Procedures Generation Package.Response to SER Confirmatory Issue 60 Complete + (ML20115J962)
- PY-CEI-NRR-2077, Forwards Corrected Individual Plant Examinations of External Events for Severe Accident Vulnerabilities. Replace Previously Submitted Copy W/Attached Copy + (ML20115J969)
- ML20115J983 + (ML20115J983)
- 05000454/LER-1985-038, :from 850117-0331,CO2 Fire Protection Sys Valve Alignment Not Verified Per Tech Specs.Caused by Surveillance Coordinator Error.Surveillance Coordinator Instructed to Check Failed Surveillances + (ML20115J984)
- ML20115J989 + (ML20115J989)
- ML20115K025 + (ML20115K025)
- ML20115K051 + (ML20115K051)
- RBG-20594, Forwards Responses to Draft Sser Input for Sections 3.10.1 & 3.10.2,per a Schwencer .Info Addresses Confirmatory Issues Identified from Seismic & Pump & Valve Site Audits Conducted During Wk of 841029 + (ML20115K063)
- ML20115K068 + (ML20115K068)
- SNRC-1163, Notifies That Info Re Colt Emergency Diesel Generator Effort Will Be Submitted by 850531,in Response to 850228 Request. Info Not in Form of FSAR Rev,But Level of Detail Will Be Equivalent + (ML20115K073)
- ML20115K082 + (ML20115K082)
- ML20115K089 + (ML20115K089)
- ML20115K094 + (ML20115K094)
- ML20115K114 + (ML20115K114)
- ML20115K116 + (ML20115K116)
- ML20115K128 + (ML20115K128)