ML20115J874
| ML20115J874 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/18/1985 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| 5211-85-2071, NUDOCS 8504240138 | |
| Download: ML20115J874 (1) | |
Text
GPU Nuclear Corporation Ngg gf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Nurnber:
A ril 18 1985 5f11-85-2071 Office of Nuclear Reactor Regulation Attn:
J. F. Stolz, Chief Operating Reactor Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Stolz:
Three Mile Island Nuclear Station Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Revised Post Eddy Current Inspection Report By letter dated February 27, 1985, GPUN submitted a report per Technical Specification 4.19.5a on the number of tubes repaired or removed from service. The number of tubes reported removed from service was 1009 in Steam Generator A and 300 in Steam Generator B.
This was based on the criteria contained in the GPUN submittal of January 31, 1985.
On March 29, 1985, GPUN informed the NRC that steam generator tubes would be plugged in accordance with the existing repair limits specified in Technical Specification 4.19.4.a.6 in order to avoid potential limitations to the restart of TMI-1. This plugging was completed April 5,1985.
In addition, 6 tubes (3 in the lane / wedge area in each steam generator) which did not exceed the repair limit were removed from service since they were stabilized. The revised totals of tubes removed from service since fabrication are 1217 in Steam Generator A and 325 in Steam Generator B.
Sincerely, f b-H. D. H 11 Director, TMI-1 HDH/SM0/spb:0229A cc:
R. Conte T. Murley H. Silver 8504240138 850418 DR ADOCK 0500 9
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation j Q
!