ML20115J855

From kanterella
Jump to navigation Jump to search
Forwards Inservice Inspection Summary Report for Second Refueling Outage of CPSES Unit 2
ML20115J855
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/23/1996
From: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20115J857 List:
References
TXX-96425, NUDOCS 9607250109
Download: ML20115J855 (3)


Text

,

-summe -

==

L r

=

1UELECTRIC Log # TXX-96425 c.L cc T.rry am, wu r"'**

File # 10010.1 905.4 Ref. # 10CFR50.55a(g)

July 23, 1996 U. S. Nucle.

.gulatory Comission Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNIT 2 DOCKET NO. 50 446 SUBMITTAL OF UNIT 2 SECOND REFUELING OUTAGE INSERVICE INSPECTION (ISI)

SUMMARY

REPORT (UNIT 2: 1986 EDITION OF ASME CODE, SECTION XI, NO ADDENDA, INTERVAL START DATE AUGUST 3, 1993, FIRST INTERVAL)

This letter forwards the Inservice Inspection Sumary Report for the second refueling outage of CPSES Unit 2.

The enclosed report is being provided to you i

pursuant to the ASME Boiler and Pressure Vessel Code,Section XI, paragraph IWA-6230. A copy of this report is also forwarded to Mr. George Bynog in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4. Please note that the Relief Requests included in Appendix C of the Enclosure are for information only. A formal request for relief will be submitted via TXX 96426 dated July 23,1996.

l

<y 1

9607250109 960723 di q')

PDR ADOCK 05000446 G

PDR

\\

\\

\\

P.O. Box 1002 GlenRose. Texas 76043 u_

._- -. - - -~.

i t

If you have any questions, please contact Obaid Bhatty at (817) 897 58359.

l Sincerely,

{

C. L. Terry t

gy. k &1u- %

I M. R. hievins Plant Manager t

Enclosure-l c-Mr. L. J. Callan Region IV l

Resident Inspector, CPSES Mr. P. M. Ray NRR Mr. G. Bynog. TDLS i

i i

I P

i

]

l 1

w--

4 J

i i

4 ENCLOSURE TO TXX-96425 i