- ML20115D696 + (ML20115D696)
- 05000373/LER-1992-009-07, :on 920923,CR Ventilation Train Received Spurious Trip Signal from B Process Radiation Monitor Due to High Radiation Spike.Detector B Adjusted & Limited Procedure LLP-92-159 Implemented + (ML20115D699)
- RBG-20635, Forwards Partial Response to IE Bulletin 84-03,Item 4 Re Time to Cladding Damage W/O Operator Action & Item 6 Re Emergency Operating Procedures.Addl Info on Item 4 & Refueling Cavity Water Seal Evaluation Expected by 850515 + (ML20115D701)
- ML20115D704 + (ML20115D704)
- ML20115D711 + (ML20115D711)
- ML20115D716 + (ML20115D716)
- ML20115D729 + (ML20115D729)
- ML20115D730 + (ML20115D730)
- PY-CEI-NRR-1557, Monthly Operating Rept for Sept 1992 for Perry Nuclear Power Plant,Unit 1 + (ML20115D751)
- ML20115D757 + (ML20115D757)
- ML20115D762 + (ML20115D762)
- ML20115D767 + (ML20115D767)
- 0CAN058202, Forwards Recent INPO Review of Emergency Preparedness Program.W/O Encl + (ML20115D823)
- HL-5199, Responds to NRC Re Violations Noted in Insp Repts 50-321/96-06 & 50-366/96-06.C/A:procedure 34GO-OPS-066-0S Revised & TS Issues Associated W/Event Will Be Discussed in Regularly Scheduled Training for Licensed Operators + (ML20115D842)
- ML20115D852 + (ML20115D852)
- 05000317/LER-1992-003, :on 920521,test Personnel Found MSIV Pipe Tunnel Fire Damper Inoperable Due to Surveillance Procedure Omission.Ts Equipment cross-reference Database Will Be Updated & Drawings Will Be Made More Specific + (ML20115D853)
- ML20115D857 + (ML20115D857)
- ML20115D862 + (ML20115D862)
- ML20115D867 + (ML20115D867)
- RC-96-0150, Rev 1 to Special Rept Spr 960004,including Info Re Imperfection in SG B,For ISI Activity Completed on 960429 + (ML20115D869)
- ML20115D878 + (ML20115D878)
- ML20115D890 + (ML20115D890)
- ML20115D898 + (ML20115D898)
- ML20115D905 + (ML20115D905)
- ELV-04056, Informs That Emergency Response Data Sys (ERDS) Implementation Has Been Completed,Per NUREG-1394.All Applicable Site Procedures Now in Place Along W/Appropriate Configuration Control for Physical Design Implemented + (ML20115D914)
- ML20115D935 + (ML20115D935)
- ML20115D962 + (ML20115D962)
- ML20115D965 + (ML20115D965)
- JAFP-85-0324, Responds to NRC Re Violations Noted in Insp Rept 50-333/84-24.Corrective Actions:Section 4.8.26 of Procedure PSP-17 Will Be Revised by 851001 to Repeat Air Injection to Ensure Removal of Water from Coolant Dilution Sample Line + (ML20115D968)
- ML20115D979 + (ML20115D979)
- 3F0796-05, Provides Addl Info on Ventilation & Heat Detectors Associated W/Rcp Oil Collection Sys + (ML20115D988)
- HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 + (ML20115D994)
- 05000296/LER-1985-008-01, :on 850309,reactor Manually Scrammed Due to Problems W/Rod Worth Minimizer Program During Controlled Shutdown.Cause Not Stated + (ML20115D997)
- BVY-96-087, Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station + (ML20115E002)
- ST-HL-AE-5414, Provides Addl Info Re Proposed Single ESF Train Mitigation Capabilities + (ML20115E005)
- ML20115E012 + (ML20115E012)
- ML20115E015 + (ML20115E015)
- ML20115E016 + (ML20115E016)
- ML20115E021 + (ML20115E021)
- ML20115E023 + (ML20115E023)
- NG-96-1297, Application for Amend to License DPR-49,consisting of TS Change Request RTS-290,revising TS Table 3.6.B.2-1 to Raise Reactor Water Conductivity Limit to Support Implementation of Noble Metal Chemical Addition + (ML20115E027)
- ML20115E029 + (ML20115E029)
- ML20115E030 + (ML20115E030)
- ML20115E036 + (ML20115E036)
- ST-HL-AE-1228, Forwards Responses to NRC Question 620.02N,Parts H,I & K & Resubmittal of Responses to Parts a & J Re Detailed Control Room Design Review.Rev 0 to Human Engineering Discrepancy Resolution Rept Also Encl + (ML20115E043)
- ML20115E055 + (ML20115E055)
- 05000388/LER-1985-011, :on 850310,damper in Standby Gas Treatment Sys Train a Malfunctioned.Caused by Damaged Damper Actuator. Actuator Replaced & Damper Operation Verified to Be Correct on 850312 + (ML20115E092)
- 05000354/LER-1994-003, :on 941121,average Power Exceeded License Power Limit.Caused by Personnel Errors.Counseled Personnel & Placed Limitations on Reactor Power and Thermal Limits Until Feedwater Transmitters Calibr + (ML20115E132)
- ML20115E142 + (ML20115E142)
- NSD-NRC-96-4759, Responds to NRC Position on Damping Values to Be Used in Piping Analyses When Sys Model Includes Flexible Equipment. Requests NRC Reaffirm Position in Subsection 3.12.5.19 of Dser That Use of 5% Damping,Acceptable for Piping Sys + (ML20115E147)
- 05000424/LER-1996-008-01, :on 960614,discovered Missed Surveillances for Secondary Sys Specific Activity.Caused by Procedural Inadequacy.Revised Applicable Procedures + (ML20115E156)