Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115A639 + (ML20115A639)
- ML20115A641 + (ML20115A641)
- 05000424/LER-1996-007-01, :on 960612,main Steamlines Isolated When Steam Dump Valve Failed Open.Caused by Failure of Steam Dump Valve to Full Open Position.Valve Repaired & Returned to Service + (ML20115A644)
- ML20115A645 + (ML20115A645)
- ML20115A646 + (ML20115A646)
- ML20115A648 + (ML20115A648)
- ML20115A650 + (ML20115A650)
- HL-2928, Comments on Review of Reactor Licensee Reporting Requirements.Util Agrees W/Numarc Comments + (ML20115A651)
- ML20115A654 + (ML20115A654)
- ML20115A655 + (ML20115A655)
- B830422, Forwards Updated Const Status Rept as of 830331.Rept Reflects Const Progress of 62%.All Indicate Commercial Operation Date of 860501 + (ML20115A657)
- ML20115A658 + (ML20115A658)
- ML20115A660 + (ML20115A660)
- 05000456/LER-1996-006-05, :on 960603,failed to Maintain TS Requirement of 0.25 H2O Differential Pressure Between Auxiliary Bldg & Atmosphere Due to Inadequate Controls Process.Throttled Auxiliary to Turbine Bldg Fire Door + (ML20115A661)
- ML20115A662 + (ML20115A662)
- ML20115A664 + (ML20115A664)
- 05000458/LER-1996-012, :on 960606,manual Reactor Scram Occurred Due to Faulty electro-hydraulic Control Power Supplies.Replaced Power Supplies W/Acceptable Ones + (ML20115A665)
- ML20115A668 + (ML20115A668)
- ML20115A672 + (ML20115A672)
- ML20115A678 + (ML20115A678)
- 05000277/LER-1996-007-01, :on 960604,ESFA Occurred Due to Loss of One off-site Electrical Source as Result of off-site Substation Activities.Reset Isolation Logics & Restored Affected Sys + (ML20115A679)
- ML20115A683 + (ML20115A683)
- 05000416/LER-1996-004-03, :on 960606,manual Reactor Scram Occurred Due to Spurious Multiple SRV Lifts.Replaced Trip Unit Card in Addition to Functionally Checking Other Card Files in Same Panel + (ML20115A685)
- ML20115A690 + (ML20115A690)
- ML20115A693 + (ML20115A693)
- ML20115A697 + (ML20115A697)
- ML20115A700 + (ML20115A700)
- ML20115A702 + (ML20115A702)
- ML20115A704 + (ML20115A704)
- ML20115A706 + (ML20115A706)
- ML20115A711 + (ML20115A711)
- ML20115A714 + (ML20115A714)
- ML20115A720 + (ML20115A720)
- 05000461/LER-1996-007, :on 960529,discovered Inoperable Leak Detection Instruments.Caused by Personnel Error.Personnel Briefed Re Event & Labelled Both Reactor Water Cleanup Sys HX Rooms Ceiling Plugs + (ML20115A721)
- ML20115A723 + (ML20115A723)
- ML20115A725 + (ML20115A725)
- ML20115A726 + (ML20115A726)
- 05000413/LER-1996-005-01, :on 960613,automatic Reactor Trip Occurred. Caused by Failed Capacitor.Replaced & Tested Failed Capacitor + (ML20115A728)
- ML20115A731 + (ML20115A731)
- 05000327/LER-1995-010, :on 950717,turbine & Reactor Trips Occurred. Caused by Bellows Being Deformed When Sudden Pressure Relay Is Isolated & Heated.New Qualitrol Relays Installed & Placed in Service + (ML20115A732)
- ML20115A735 + (ML20115A735)
- 05000482/LER-1996-006, :on 960606,reactor Trip Occurred.Caused by Inadequate Design Mod Procedures.Installed Correct Pins in Three of Four Main Feedwater Regulating Valves,Placed Holds on Stored Equipment & Revised Procedures + (ML20115A736)
- ML20115A739 + (ML20115A739)
- 05000456/LER-1995-013, :on 960604,determined Fire Protection Discrepancies.Caused by Inadequate Evaluations.Continued Hourly Fire Watches & Initiated Plant Modifications + (ML20115A742)
- ML20115A744 + (ML20115A744)
- ML20115A746 + (ML20115A746)
- ML20115A747 + (ML20115A747)
- ML20115A749 + (ML20115A749)
- ML20115A750 + (ML20115A750)
- ML20115A754 + (ML20115A754)
- ML20115A756 + (ML20115A756)