Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-85-0024, Forwards Revised Justifications for Continued Operation on Environ Qualification of Electrical Equipment,Per .Justification for Continued Operation for 480-volt Load Ctrs Modified to Ref Rept for Actual Load Ctr + (ML20114B588)
- NRC-92-0086, Forwards Comments on Draft Rev to Insp Procedure 62703, Monthly Maint Observations. Comments,If Accepted,Will Add Value to NRC performance-based Approach to Insps + (ML20114B595)
- 05000338/LER-1984-026, :on 841231,reactor Trip/Turbine Trip Occurred from 100% Power.Caused by Failed Firing Card in Rod Control Sys That Allowed Four Control Rods to Drop Into Core.Failed Firing Card Replaced & Startup Commenced + (ML20114B598)
- ML20114B600 + (ML20114B600)
- 1CAN089205, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-313/92-20 on 920608-12.Corrective Actions:Personnel Involved Counseled & Revs to Procedure 1000.024, Control & Maint & 1025.003, Conduct of Maint Completed + (ML20114B604)
- ML20114B605 + (ML20114B605)
- RBG-19-973, Forwards Response to SER Confirmatory Item 52 Re TMI Item II.F.1.Lines Mfg Using Stainless Steel in Order to Minimize Iodine & Particulate plate-out in Sample Lines from Process Streams.W/O Encl + (ML20114B606)
- ML20114B609 + (ML20114B609)
- ML20114B610 + (ML20114B610)
- ML20114B612 + (ML20114B612)
- 05000397/LER-1984-130, :on 841220,during Review of Procedure to Verify Containment Integrity,Several Primary Containment Isolation Valves Not Verified in Accordance W/Tech Specs.Verification Procedure Revised + (ML20114B617)
- ML20114B624 + (ML20114B624)
- ML20114B625 + (ML20114B625)
- BSEP-92-0009, Semiannual Radioactive Effluent Release Rept for Brunswick Steam Electric Plant for Jan-June 1992 + (ML20114B626)
- ML20114B627 + (ML20114B627)
- ML20114B628 + (ML20114B628)
- ML20114B632 + (ML20114B632)
- ML20114B633 + (ML20114B633)
- 05000397/LER-1984-127, :on 841218,during Wiring Changes to Auxiliary Steam Sys,Automatic Isolation of Reactor Water Cleanup (RWCU) Sys Occurred.Logic Signal Reset & RWCU Sys Returned to Svc + (ML20114B635)
- ML20114B636 + (ML20114B636)
- ML20114B637 + (ML20114B637)
- ML20114B640 + (ML20114B640)
- ML20114B644 + (ML20114B644)
- ML20114B645 + (ML20114B645)
- ML20114B647 + (ML20114B647)
- ML20114B650 + (ML20114B650)
- ML20114B651 + (ML20114B651)
- ML20114B659 + (ML20114B659)
- ML20114B660 + (ML20114B660)
- ML20114B661 + (ML20114B661)
- ML20114B671 + (ML20114B671)
- ML20114B673 + (ML20114B673)
- ML20114B676 + (ML20114B676)
- ML20114B682 + (ML20114B682)
- ML20114B683 + (ML20114B683)
- 05000389/LER-1984-016-02, :on 841219,turbine/reactor Trip Occurred on Low Vacuum Due to Condensate Pump 2B Recirculation Line Crack. Cause Not Stated.Recirculation Line,Breaker & Reactor Coolant Pressure Seals Replaced + (ML20114B687)
- ML20114B696 + (ML20114B696)
- ML20114B707 + (ML20114B707)
- ML20114B708 + (ML20114B708)
- A04566, Responds to NRC Re Violations Noted in Insp Rept 50-423/84-20.Corrective Actions:S&W Field QC & QA Personnel Initiated Surveillance Insp to Ensure Compliance W/Welding Electrode Procedure & Welder Involved Terminated + (ML20114B716)
- ML20114B718 + (ML20114B718)
- ML20114B719 + (ML20114B719)
- ML20114B720 + (ML20114B720)
- ML20114B724 + (ML20114B724)
- ML20114B728 + (ML20114B728)
- ML20114B729 + (ML20114B729)
- ML20114B731 + (ML20114B731)
- ML20114B736 + (ML20114B736)
- ML20114B741 + (ML20114B741)
- ML20114B748 + (ML20114B748)
- ML20114B751 + (ML20114B751)