Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113G873 + (ML20113G873)
- ML20113G875 + (ML20113G875)
- B14138, Forwards Corrected Table 3,correcting Typo in Spent Fuel Pool Criticality Analyses,Previously Submitted in 920416 Proposed License Amend + (ML20113G877)
- ML20113G885 + (ML20113G885)
- ML20113G888 + (ML20113G888)
- ML20113G890 + (ML20113G890)
- ML20113G892 + (ML20113G892)
- RBG-19872, Interim Deficiency Rept DR-273 Re Relocation of Four Rosemount Pressure Transmitters.Next Rept Anticipated by 850228 + (ML20113G897)
- RBG-19851, Interim Deficiency Rept DR-264 Re Physical Separation Between Div I & Div II Panel Wiring in GE Supplied Remote Shutdown Panel C61-P001.Next Rept Anticipated by 850301 + (ML20113G908)
- RBG-19852, Interim Deficiency Rept DR-184 Re Shop Weld on Bf Shaw,Co Support Trunnion.Next Rept Anticipated by 850214 + (ML20113G929)
- ML20113G935 + (ML20113G935)
- ML20113G940 + (ML20113G940)
- ML20113G942 + (ML20113G942)
- ML20113G946 + (ML20113G946)
- ML20113G950 + (ML20113G950)
- RBG-19853, Final Deficiency Rept DR-227 Re Push Rod Sockets (Cups) in Intermediate Rocker Assemblies of Standby Diesel Generators Supplied by Tdi.Initially Reported on 841210.Deficient Push Rod Sockets Replaced + (ML20113G952)
- ML20113G955 + (ML20113G955)
- ML20113G966 + (ML20113G966)
- ML20113G974 + (ML20113G974)
- RBG-19830, Final Deficiency Rept DR-228 Re Cylinder Head Valves in Standby Diesel Generators Supplied by Tdi.Initially Reported on 841206.Defective Valves on 1EGS*EG1A Replaced W/ Equivalent Acceptable Valves + (ML20113G978)
- RBG-19831, Final Deficiency Rept DR-259 Re Split Terminal Blocks Mfg by Underwriter Safety Device Co.Details Provided Re Incorporation of Brackets in All Motor Control Ctr Cubicles Containing Terminal Blocks + (ML20113G987)
- ML20113G988 + (ML20113G988)
- ML20113G992 + (ML20113G992)
- 05000321/LER-1984-019, :on 841011,outer Clamp Missing on Seismic Restraint for RHR Svc Water Pump B (E11-COO1B).Caused by Inadequate Const/Installation.Outer Clamp Replaced During Pump Reassembly + (ML20113G997)
- ML20113H000 + (ML20113H000)
- ML20113H024 + (ML20113H024)
- ML20113H027 + (ML20113H027)
- RBG-19857, Final Deficiency Rept DR-173 Re Shop Radiographs for Welds on Main Steam Pipe Elbows Supplied by Ge.Welds Reradiographed After Weld Ripple Ground.Item Not Reportable Per 10CFR50.55(e) + (ML20113H032)
- ML20113H054 + (ML20113H054)
- ML20113H105 + (ML20113H105)
- ML20113H120 + (ML20113H120)
- ML20113H126 + (ML20113H126)
- 05000247/LER-1984-024, :on 841218,erroneous Weld Channel Pressurization Line Connection Discovered.Caused by Personnel Error.Contractor QC Procedures Enhanced to Prevent Further Occurences + (ML20113H130)
- ML20113H151 + (ML20113H151)
- 3F0185-05, Informs of Intention to Pursue Large Bore Snubber Optimization Program Utilizing Generic Methodology of BAW-1847, Leak-Before-Break Evaluation of Margins..., Per 850114 Telcon.Concurrence Requested by May 1985 + (ML20113H153)
- 05000373/LER-1984-089-01, :on 841225,high Ammonia Alarm Received in Control Room Ventilation/Auxiliary Electric Equipment Room Ventilation Sys.Cause Could Not Be Determined.Alarm Reset + (ML20113H159)
- 05000315/LER-1984-035, :on 841221,during Review of 18-month Surveillance Test Procedure for Ice Condenser Intermediate Deck Doors,Seven Doors Exceeded Tech Spec Requirement.Doors Lubricated & Tested + (ML20113H162)
- ML20113H172 + (ML20113H172)
- ML20113H179 + (ML20113H179)
- ML20113H186 + (ML20113H186)
- ML20113H191 + (ML20113H191)
- ML20113H205 + (ML20113H205)
- ML20113H214 + (ML20113H214)
- B14199, Responds to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Containment Temp Monitored for Sudden Temp Increases + (ML20113H215)
- ML20113H216 + (ML20113H216)
- ML20113H220 + (ML20113H220)
- 05000461/LER-1992-007-01, :on 920623,determined That Previously Performed Testing for Loss of Power Not in Accordance W/Ts.Caused by Misinterpretation of Test Requirements by Writers. Procedures Will Be Revised Per TS + (ML20113H233)
- ML20113H295 + (ML20113H295)
- ML20113H301 + (ML20113H301)
- ML20113H304 + (ML20113H304)
- ML20113H308 + (ML20113H308)