List of results
- ML20113D466 + (ML20113D466)
- ML20113D470 + (ML20113D470)
- ML20113D471 + (ML20113D471)
- 3F0485-08, Forwards Annual Schedule Update for Commitments Re Proposed Schedule for Implementation of Emergency Response Capability Requirements,Per Suppl 1 to NUREG-0737,Items 1.C.1,1.D.1, I.D.2,III.A.1.2 & II.A.2.2 + (ML20113D473)
- ST-HL-AE-1219, Forwards Responses to NRC 850211 Questions.Procedures & Sys Review Branch Questions Will Be Answered by Amend to FSAR Section 14.2 by 850601.W/22 Oversize Drawings.Aperture Cards Available in PDR + (ML20113D475)
- ML20113D482 + (ML20113D482)
- ML20113D490 + (ML20113D490)
- ML20113D491 + (ML20113D491)
- ML20113D494 + (ML20113D494)
- W3P84-3020, Advises That Util Will Post Security Guards at Doors D128 & D194 Until Replacement of Security Lock Cores Completed,Per IE Circular 77-04.Completion Anticipated by Late Nov W/O Adversely Impacting Full Load Schedule,Per 10CFR73.2 + (ML20113D499)
- ML20113D502 + (ML20113D502)
- ML20113D503 + (ML20113D503)
- ML20113D507 + (ML20113D507)
- ML20113D511 + (ML20113D511)
- ML20113D513 + (ML20113D513)
- ML20113D516 + (ML20113D516)
- ML20113D536 + (ML20113D536)
- ML20113D541 + (ML20113D541)
- ML20113D542 + (ML20113D542)
- ML20113D549 + (ML20113D549)
- B11504, Advises That Final Master Equipment List Transmitted to NRC Project Manager & BNL Per NRC Request During Sqrt & Pump & Valve Operability Review Team 850304-08 Audits + (ML20113D556)
- ML20113D568 + (ML20113D568)
- ML20113D575 + (ML20113D575)
- RBG-20569, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-01.Corrective Actions:Followup Surveillances of Station 55 Completed & Training on Control/Maint of Site Procedures/Manuals Provided to Clerks + (ML20113D581)
- PY-CEI-NRR-0218, Forwards Request for Permanent Exemption from 10CFR50,App J, Paragraph III.D.2(b)(ii) Re Testing of Airlocks Opened When Containment Integrity Not Required by Tech Specs.Tech Spec 4.6.1.3.b.2 Provides Equivalent Protection + (ML20113D585)
- ML20113D586 + (ML20113D586)
- ML20113D587 + (ML20113D587)
- B11478, Responds to SER (NUREG-1031),Open Items 14.1,14.2 & 14.7. Status of Listed Fire Protection Open Items & Supporting Documentation Encl + (ML20113D588)
- NRC-96-0062, Forwards Util Renewal of NPDES Permit MI0037028 for Plant Which Had Been Reissued on 960531 & Became Effective on 960601 + (ML20113D599)
- ML20113D617 + (ML20113D617)
- ML20113D625 + (ML20113D625)
- ML20113D629 + (ML20113D629)
- ML20113D634 + (ML20113D634)
- W3P84-3113, Responds to NRC Re Violations Noted in Insp Rept 50-382/84-31.Corrective Actions:List of Selected Plant Procedures Requiring QA Review Established & Executive Directive Sys Manuals Verified Complete & Updated + (ML20113D649)
- ML20113D650 + (ML20113D650)
- ML20113D657 + (ML20113D657)
- ML20113D694 + (ML20113D694)
- ML20113D695 + (ML20113D695)
- ML20113D696 + (ML20113D696)
- ML20113D697 + (ML20113D697)
- ML20113D701 + (ML20113D701)
- ML20113D706 + (ML20113D706)
- ML20113D710 + (ML20113D710)
- ML20113D719 + (ML20113D719)
- L-85-109, Responds to Violations Noted in Insp Repts 50-250/84-39 & 50-251/84-40.Corrective Actions:Operating Procedure 7304.1 Re Periodic Test of Auxiliary Feedwater Sys & Tech Spec 3.8 Revised to Clarify Limiting Conditions for Operation + (ML20113D727)
- ML20113D732 + (ML20113D732)
- W3P84-3236, Responds to NRC Re Violations Noted in Insp Rept 50-382/84-39.Corrective Actions:Condition Identification & Work Authorization (Ciwa) 008402 Removed from Control Room Ciwa Files + (ML20113D745)
- ML20113D760 + (ML20113D760)
- ML20113D767 + (ML20113D767)
- ML20113D768 + (ML20113D768)
- ML20113D773 + (ML20113D773)