Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113A981 + (ML20113A981)
- ML20113A988 + (ML20113A988)
- ML20113A989 + (ML20113A989)
- ML20113B018 + (ML20113B018)
- 2CAN069603, 1995 ANO Unit 2 10CFR50.59 Rept, for Period Ending 951120 + (ML20113B038)
- ML20113B053 + (ML20113B053)
- 0CAN069602, Forwards Response to Violations Noted in Insp Repts 50-313/96-02 & 50-368/96-02.Corrective Actions:Valve Chain Reconfigured & Locked to Preclude Valve Operation + (ML20113B060)
- 05000333/LER-1996-007-01, :on 960522,sys Isolations & Standby Gas Treatment Initiation Occurred.Caused by False High Radiation Trip Signal.Detector Replaced W/Vendor Current Model + (ML20113B061)
- 05000318/LER-1996-002-01, :on 960522,fire Watch Missed.Caused by Personnel Error.Counseled Personnel Re Event + (ML20113B062)
- 05000313/LER-1996-005-02, :on 960519,automatic Reactor Trip on High RCS Pressure Occurred.Caused by Component Failure in a MFW Pump Control Sys.Failed Speed Sensor Replaced + (ML20113B063)
- 05000293/LER-1996-007, :on 960519,LCO for Operation for Switchyard Battery Exceeded Tech Spec.Caused by Personnel Error.Revised Procedure 8.9.8.4 & Revised Master Surveillance Tracking Program Nodes + (ML20113B082)
- L-84-353, Responds to NRC Re Violations Noted in Insp Repts 50-250/84-25 & 50-251/84-26.Corrective Actions:New Training Video Tape Prepared to Address Requirements of Administrative Procedure 0306 + (ML20113B085)
- BSEP-96-0225, Forwards Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20113B086)
- ML20113B089 + (ML20113B089)
- ML20113B095 + (ML20113B095)
- 3F0696-05, Provides Response to Violation Noted in Insp Rept 50-302/96-03.Corrective Actions:Ltr Addressed to All Radiation Workers Reviewing Event Issued + (ML20113B098)
- ML20113B110 + (ML20113B110)
- U-602595, Forwards Response to Violations Noted in NRC Insp Rept 50-461/96-03.Corrective Actions:Injector Setting Jack Removed from Twelve Cylinder Diesel Engine & Governor Restored to Normal Configuration + (ML20113B121)
- ML20113B128 + (ML20113B128)
- ML20113B129 + (ML20113B129)
- NRC-96-0056, Discusses SALP 15 Response & Comments Made by NRC During SALP Meeting on 960521 + (ML20113B131)
- 05000341/LER-1996-009, :on 960526,ESF Actuation Occurred.Caused by Plant Operator Attempting to Replace Burned Out Indicating Bulb,Cracked Socket Separated Completely,Resulting in Short Circuit.Lamp Socket Wires Taped + (ML20113B150)
- 05000277/LER-1995-006, :on 951022,offsite Electrical Power Source Lost.Caused by Momentary Deenergization of Several Electrical Distribution Panels.Isolation Logics Reset & Affected Sys Restored + (ML20113B151)
- ML20113B178 + (ML20113B178)
- ML20113B185 + (ML20113B185)
- ML20113B191 + (ML20113B191)
- ML20113B195 + (ML20113B195)
- ML20113B197 + (ML20113B197)
- W3P85-1205, Personnel Monitoring Rept 1984 + (ML20113B201)
- ML20113B203 + (ML20113B203)
- RC-96-0157, Part 21 Rept Re Nozzle Weld Defects in Chemical & Vol Control Sys Connections at RCP Seal Injection Nozzles & Ccws Connections at RCP Thermal Barrier Heat Exchanger Inlet & Outlet Nozzles Supplied by W + (ML20113B207)
- NSD-NRC-96-4751, Forwards Three Copies of Westinghouse Responses to NRC RAI on AP600 Topics + (ML20113B208)
- L-96-159, Forwards Rev 11 to Safeguards Contingency Plan.Encl Withheld (Ref 10CFR2.790(a)(3)) + (ML20113B225)
- ML20113B257 + (ML20113B257)
- ML20113B276 + (ML20113B276)
- ML20113B278 + (ML20113B278)
- ML20113B283 + (ML20113B283)
- ML20113B286 + (ML20113B286)
- ML20113B289 + (ML20113B289)
- ML20113B290 + (ML20113B290)
- 05000362/LER-1984-043-01, :on 841128,auxiliary Feedwater Sys Discharge Pipe Venting Missed in Nov & Dec 1984.Caused by Error in Incorporating Procedure Change.Requirement Added to Appropriate Procedures + (ML20113B303)
- ML20113B307 + (ML20113B307)
- 05000454/LER-1984-034-03, :on 841227,discrepancy in Number of Sources Received on 841221 Discovered.Caused by Rad/Chem Technician Comparing Package Contents to DOT Sticker Instead of Packing List.Procedures Being Revised + (ML20113B310)
- 05000387/LER-1984-049, :on 841214,suppression Chamber Purge Initiated W/O Required Sampling & Analyses.Caused by Personnel Error. Procedure Rev Initiated & Personnel Counseled + (ML20113B313)
- 05000454/LER-1984-030-03, :on 841218,instrument Bus 111 Deenergized & Boron Dilution on Protection Sys Actuated Due to Deenergization of Nuclear Instrumentation Channel I.Caused by Shorted Capacitor in Control Circuitry + (ML20113B321)
- ML20113B324 + (ML20113B324)
- ML20113B330 + (ML20113B330)
- ML20113B335 + (ML20113B335)
- ML20113B337 + (ML20113B337)
- 05000374/LER-1984-084, :on 841214,setpoint for Trip of 2E31-N602B Module Actuated Outside Allowable Tolerance.Cause Unknown. Spare Module Calibr & Installed.Output of Module Stable During Bench Testing + (ML20113B340)
- ML20113B341 + (ML20113B341)