Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20112K033 + (ML20112K033)
- ML20112K034 + (ML20112K034)
- ML20112K037 + (ML20112K037)
- ML20112K038 + (ML20112K038)
- ML20112K042 + (ML20112K042)
- ML20112K044 + (ML20112K044)
- ML20112K046 + (ML20112K046)
- ML20112K054 + (ML20112K054)
- ML20112K055 + (ML20112K055)
- ML20112K059 + (ML20112K059)
- ML20112K067 + (ML20112K067)
- ML20112K075 + (ML20112K075)
- ML20112K077 + (ML20112K077)
- ML20112K080 + (ML20112K080)
- ML20112K082 + (ML20112K082)
- 05000364/LER-1995-001, :on 950405,S/G Tubes Degradation Found.Caused by PWSCC & Outer Diameter Stress Corrosion Cracking (Odscc). S/G Tubes Plugged & Program of Boric Acid Addition Being Continued to Reduce Potential for ODSCC + (ML20112K089)
- ML20112K094 + (ML20112K094)
- ML20112K100 + (ML20112K100)
- ML20112K105 + (ML20112K105)
- BSEP-84-1773, Semiannual Radioactive Effluent Release Rept,Jan-June 1984 + (ML20112K107)
- ML20112K113 + (ML20112K113)
- ML20112K116 + (ML20112K116)
- ML20112K118 + (ML20112K118)
- ML20112K119 + (ML20112K119)
- ML20112K125 + (ML20112K125)
- ML20112K128 + (ML20112K128)
- IR 05000416/1984046 + (ML20112K141)
- ML20112K149 + (ML20112K149)
- ML20113A000 + (ML20113A000)
- ML20113A001 + (ML20113A001)
- ML20113A011 + (ML20113A011)
- RBG-20486, Final Deficiency Rept DR-272 Re spring-can Hanger Pins Not Removed During Recirculation Sys Hot Flow Test.Startup & Test Procedure ST-101, Balance-of-Plant Pipe Expansion, Revised + (ML20113A013)
- ML20113A020 + (ML20113A020)
- TXX-4445, Interim Significant Deficiency Rept SDAR-171 Re Reliance Control Board That Differs from Equipment Qualification Rept.Initially Reported on 850226.Investigation Continuing & Evaluation Completed by 850419 + (ML20113A021)
- ML20113A022 + (ML20113A022)
- 05000425/LER-1996-002-02, :on 960528,rod Positions Not Verified for Inoperable Rod Position Deviation Monitor.Caused by Misleading Procedure.Procedure 17010-2 Clarified + (ML20113A026)
- 05000424/LER-1996-006-01, :on 960525,reactor Trip Occurred Due to Blown Fuse in Isolation Valve.Fuse Replaced & Unit Restarted & Returned to Power.Analysis of Failed Fuse Expected to Be Completed by 960628 + (ML20113A035)
- ML20113A071 + (ML20113A071)
- ML20113A074 + (ML20113A074)
- ML20113A078 + (ML20113A078)
- ML20113A080 + (ML20113A080)
- ML20113A084 + (ML20113A084)
- ML20113A086 + (ML20113A086)
- ML20113A089 + (ML20113A089)
- ML20113A092 + (ML20113A092)
- ML20113A095 + (ML20113A095)
- ML20113A102 + (ML20113A102)
- DCL-85-112, Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo + (ML20113A103)
- ML20113A112 + (ML20113A112)
- ML20113A115 + (ML20113A115)
- ML20113A121 + (ML20113A121)