Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3P85-0339, Final Significant Const Deficiency Rept SCD-93 Re Charging & Letdown Containment Isolation Valve Deficiency.Vendor Repaired Valve W/New Seats Sized for Max Interference Fit + (ML20107N056)
- ML20107N070 + (ML20107N070)
- ML20107N081 + (ML20107N081)
- ML20107N095 + (ML20107N095)
- ML20107N109 + (ML20107N109)
- W3P85-0337, Final Significant Const Deficiency Rept SCD-80 Re Unsatisfactory Stroking of Emergency Feedwater Pump Turbine Steam Supply shut-off Valves.Pneumatic Operators for Valves 2MS-V611A & V612 Replaced w/D-C Motors + (ML20107N110)
- ML20107N140 + (ML20107N140)
- LD-84-063, Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde + (ML20107N147)
- ML20107N159 + (ML20107N159)
- ML20107N167 + (ML20107N167)
- ML20107N172 + (ML20107N172)
- ML20107N195 + (ML20107N195)
- ML20108A001 + (ML20108A001)
- ML20108A002 + (ML20108A002)
- ML20108A011 + (ML20108A011)
- ML20108A012 + (ML20108A012)
- ML20108A019 + (ML20108A019)
- ML20108A022 + (ML20108A022)
- ML20108A025 + (ML20108A025)
- ML20108A035 + (ML20108A035)
- ML20108A046 + (ML20108A046)
- 05000302/LER-1996-009, :on 960327,failure to re-attach Instrument Tubing to Seismic Supports After Mod Leads to Operation Outside Design Basis Occurred.Caused by Personnel Error. Instrument Tubing Properly Supported + (ML20108A048)
- 3F0496-30, Special Rept 96-02:on 960313,fire Detection Zones Required by Fire Protection Plan Out of Svc for Greater than Fourteen Days.Hourly Fire Watch Established + (ML20108A053)
- ML20108A063 + (ML20108A063)
- ML20108A098 + (ML20108A098)
- ML20108A104 + (ML20108A104)
- ML20108A111 + (ML20108A111)
- ML20108A117 + (ML20108A117)
- ML20108A125 + (ML20108A125)
- ML20108A129 + (ML20108A129)
- ML20108A131 + (ML20108A131)
- ML20108A143 + (ML20108A143)
- ML20108A150 + (ML20108A150)
- BSEP-85-0106, Responds to NRC Re Violations Noted in Insp Repts 50-324/84-34 & 50-325/84-34.Corrective Actions:Util & GE Demonstrated That Cracks in 28-inch Weld Would Have Been Detected + (ML20108A164)
- 05000255/LER-1984-027, :on 841122 & 1204,charging Pump Could Not Be Started from Control Room or W/Local Start Button.Caused by Closing Coil Failure in Breaker.Breakers Will Be Included in Preventive Maint Program + (ML20108A168)
- ML20108A178 + (ML20108A178)
- 05000400/LER-1996-002, :on 960117,failure to Perform Required Surveillance Testing During Planned Maint Outage in Oct 1994 Identified.Caused by Personnel Error.Personnel Involved in Procedure Counseled + (ML20108A188)
- 05000368/LER-1982-006-03, /03X-2:on 820212,17,0319 & 29,containment Isolation Valve 2CV-2061-2 for Reactor Bldg Sump Drain Failed to Close.Caused by Failing Actuator.Actuator Reassembled & Air Supply Line Relocated + (ML20108A209)
- ML20108A212 + (ML20108A212)
- ML20108A228 + (ML20108A228)
- ML20108A236 + (ML20108A236)
- ML20108A239 + (ML20108A239)
- BSEP-84-2107, Forwards Monthly Operating Repts for Sept 1984 & Corrected Feb 1983 Rept.Gross Thermal Energy Gen (Line 16) Incorrect Due to Apparent Software Problem.Problem Being Investigated. W/O Feb 1983 Rept + (ML20108A242)
- PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process + (ML20108A246)
- ML20108A251 + (ML20108A251)
- ML20108A257 + (ML20108A257)
- ML20108A258 + (ML20108A258)
- ML20108A269 + (ML20108A269)
- W3P84-2964, Final Rept of Significant Const Deficiency 90 Re Overstressed Electrical Conduit.Revised Design Criteria Based on Analysis Issued.Items Remaining in Balance of Plant Will Be Completed by 841103 + (ML20108A270)
- RBG-19292, Interim Deficiency Rept DR-185 Re Placement of Two Isolation Valves Outside Containment for RCIC Turbine Exhaust Line Vacuum Breaker Sys.Interim or Final Status Rept Will Be Provided by 850116 + (ML20108A271)
- W3P84-2965, Interim Rept of Significant Const Deficiency 93 Re Charging & Letdown Containment Isolation Valves.Valve Replaced W/New Seats.Further Testing Recommended to Verify Proper Valve Operation.Next Rept Will Be Submitted by Dec 1984 + (ML20108A283)