Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106F196 + (ML20106F196)
- ML20106F197 + (ML20106F197)
- ML20106F199 + (ML20106F199)
- L-2020-074, Response to Request for Additional Information for Relief Request No. 6 + (ML20106F200)
- BYRON 2020-0025, Annual Dose Report 2019 + (ML20106F202)
- IR 05000458/2019015 + (ML20106F203)
- ML20106F205 + (ML20106F205)
- OIG-20-A-05, Defense Contract Audit Agency (Dcaa) Audit Report Number 01321-2018M10100020 Dated April 15, 2020 + (ML20106F211)
- ML20106F214 + (ML20106F214)
- ML20106F216 + (ML20106F216)
- ML20106F217 + (ML20106F217)
- ML20106F218 + (ML20106F218)
- ML20106F219 + (ML20106F219)
- ML20106F220 + (ML20106F220)
- ML20106F221 + (ML20106F221)
- ML20106F222 + (ML20106F222)
- ML20106F223 + (ML20106F223)
- ML20106F226 + (ML20106F226)
- Press Release-II-20-009, NRC Schedules Virtual Meeting to Discuss 2019 Safety Performance of North Anna and Surry Nuclear Power Plants + (ML20106F231)
- Press Release-20-023, NRC Issues Report on Review of Indian Point Pipeline Issues; Reactors Remain Safe + (ML20106F232)
- ML20106F234 + (ML20106F234)
- ML20106F235 + (ML20106F235)
- ML20106F242 + (ML20106F242)
- ML20106F247 + (ML20106F247)
- ML20106F248 + (ML20106F248)
- ML20106F249 + (ML20106F249)
- 05000255/LER-1984-019, :on 840908,overspeeding Auxiliary Feedwater Pump P-8B Discovered.Caused by Failed Mechanical Governor Bearing Assembly & Bent Spindle on Pump Turbine Drive. Damaged Parts Replaced + (ML20106F278)
- 05000331/LER-1984-035, :on 840921 & 26,four Violations Occurred Involving Two Secondary Containment Air Lock Doors Simultaneously Opening.Caused by Defective Door Interlock & Latching Mechanisms.Mechanisms Repaired + (ML20106F292)
- ML20106F295 + (ML20106F295)
- RBG-42342, Forwards 1996 Emergency Preparedness Exercise. Scenario Package Contains Exercise Objectives,Observer Info, Narrative Summary,Onsite Messages Including Expected Player Actions & Radiological Info + (ML20106F313)
- ML20106F315 + (ML20106F315)
- ML20106F323 + (ML20106F323)
- ML20106F330 + (ML20106F330)
- ML20106F331 + (ML20106F331)
- ML20106F332 + (ML20106F332)
- ML20106F339 + (ML20106F339)
- W3P84-3044, Forwards Summary Evaluation,Structural Significance of Basemat NDT Results & NDT Evaluation of Basemat Concrete, in Response to DM Crutchfield to Jm Cain + (ML20106F342)
- 05000374/LER-1996-001-01, :on 960117,discovered During TS Hourly Fire Watch Surveillance of Div I,Ii & III CSC Pump Rooms,Div I Room Not Observed.Caused by Personnel Error.Fire Watch Surveillance for Div I Room Established + (ML20106F350)
- TXX-4325, Forwards Ltr Containing Safeguards Info.Ltr Should Be Considered as Formal Ltr of Transmission for 841008 Document.Ltr Withheld (Ref 10CFR73.21) + (ML20106F351)
- ML20106F354 + (ML20106F354)
- ML20106F355 + (ML20106F355)
- ML20106F360 + (ML20106F360)
- ML20106F367 + (ML20106F367)
- ML20106F371 + (ML20106F371)
- ML20106F376 + (ML20106F376)
- ML20106F377 + (ML20106F377)
- ML20106F383 + (ML20106F383)
- 05000454/LER-1985-005, :on 850111,daily Surveillance of Diesel Generator 2A Not Performed.Caused by Personnel Error. Surveillance Performed & Licensed Operators Reminded to Perform Required Surveillances on Schedule + (ML20106F389)
- ML20106F391 + (ML20106F391)
- ML20106F392 + (ML20106F392)
- 05000261/LER-1985-004-01, :on 850108,reactor Trip Occurred Due to Steam Generator C Low Level Coincident W/Steam Flow/Feed Flow Mismatch Signal.Caused by Technician Equalizing Wrong Transmitter.Technician Counseled + (ML20106F396)