Part 21 Rept Re Erroneous Design Assumption for Postulated Pipe Rupture on Reactor Side of Break in Feedwater Sys. Initially Reported on 841024.All Targets & Shields Will Be Reviewed.Addl Shields Will Be Designed & Installed
ML20106F330
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 10/26/1984
From: Sailer W
GAGE-BABCOCK ASSOCIATES, INC.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-84-504-000 PT21-84-504, PT21-84-504-000, NUDOCS 8410300190
Download: ML20106F330 (2)


Text

s.

4

[ Gilbert / Commonwealth engineersandconsuitants GILBERT / COMMONWEALTH, INC., P.O. Box 1498, Reading, PA 19603/Tel. 215 775-2600/ Cable Gilasoc/ Telex 836431 October 26, 1984 W.F. SAILER Vice President & General Mana0er Quality Assurance Division United States Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D.C. 20555 Attention: Mr. R. C. DeYoung Re: Reportable Event Postulated Pipe Rupture Jet Impingemcat Loads

Dear Mr. DeYoung:

This documents my report by telephot.- under the provisions of 10CFR21 on October 24, 1984, at approximately 5:20 p.m.

Individual Who Reported Mr. W. F. Sailer, Vice President and General Manager, Quality Assurance Division, Gilbert /Conunonwealth, Inc.

Facility Involved Perry Nuclear Power Plant, Units 1 and 2, being constructed by the Cleveland Electric Illuminating Company.

Activity / Component Involved Feedwater System pipe rupture design.

Nature of the Defect An erroneous asssumption was made in desi F "ing for postulated pipe rupture of the feedwater system. It was assumed th t jet force and jet shape information used for the feedwater pump side o^ a break could also be used for the reactor side of the break.

A recently received report of GE's analysis indicates that the total jet force is 25% greater, and the jet shape is potentially different, than had 1

been assumed in the G/C calculation. This may result in the failure of protection devices or essential equipment.

h g s

525 Lancaster Avenue. Reading. PAIMoroantown Road. Green HiHs. Reading. PA 215 7752600 ge 200 East Wastungton Avenue. Jackson. MI 5tT 788-320 , Q u-____--__---___--____-_---_--_---_-_____-____

f;~ >

-r .

4-Q 1

[ 011hert/Ceaunenumeelsh eneawiwcenu.=

!;  : euem-m. me, ea em us, w en umuu m rmeoote sm.cn+ ame  ;

L

7

. United States Nuclear. Regulatory Commission October 26, 1984 l Attention: Mr. R. C. DeYoung Page 2  :

r- i L

j:

  • Date Information Obtained The QAD General Manager was-informed on October 24, 1984 of the reportability of this item.

The jet pressure calculations for other Perry systems have been reviewed. It has been. determined that this discrepancy exists only in the Feedwater System.

Corrective Action Gilbert / Commonwealth will review all targets and shields affected by the increased pressure to determine whether failure of the protection devise or

.the essential equipment will occur. .

The review will take three months to complete. Additional shielding will be designed and installed if required by the results of the review.

.If you require any further information, please call me at (215)775-2600, Extension 7543..

Very truly yours, N s W. F. Sailer Vice President & General Manager I Quality Assurance Division e> WFStkb-Attachment- ,

l cca H. Lorens C. D. Williams G. R. Leidich - CEI [

R. C. DeYoung - 2 U. Potapovs - Vendor Branch, NRC Document Management Branch - NRC j