Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-20001, Final Deficiency Rept DR-206 Re Improper Lubricant in Two Final Pool Cooling Pumps & Motors.Initially Reported on 841228.Motors Disassembled,Cleaned & Repacked + (ML20106B573)
- ML20106B574 + (ML20106B574)
- ML20106B575 + (ML20106B575)
- 05000352/LER-1985-002, :on 850104,spurious Isolation of Reactor Water Cleanup Sys Occurred.Caused by High Differential Flow Between Sys Inlet & Outlet While Valving Filter/ Demineralizer B Into Svc.Isolation Reset + (ML20106B576)
- ML20106B579 + (ML20106B579)
- ML20106B593 + (ML20106B593)
- ML20106B604 + (ML20106B604)
- ML20106B611 + (ML20106B611)
- ML20106B613 + (ML20106B613)
- 05000321/LER-1985-003-01, :on 850106,reactor Protection Sys Logic Actuation Occurred During Completion of Maint Activities on Reactor Low Water Level Instrument 1B21-N080A,due to Backfilling 1B21-N080A Before Return to Svc + (ML20106B616)
- 05000333/LER-1985-002, :on 850117 & 18,shift Technical Advisor Position Unfulfilled.Qualified Individual Called in When Deficiency Noted.Caused by Personnel Error Due to Implementation of Worker Schedule Changes + (ML20106B618)
- ML20106B625 + (ML20106B625)
- ML20106B628 + (ML20106B628)
- 05000454/LER-1985-009, :on 850108,main Steam Line Isolation Caused by Technician Performing Work on Incorrect Steam Pressure Channel.Plant Operation Unaffected.Event Discussed W/ Technician & at Instrument Dept Meeting + (ML20106B631)
- ML20106B638 + (ML20106B638)
- ML20106B641 + (ML20106B641)
- ML20106B642 + (ML20106B642)
- ML20106B644 + (ML20106B644)
- ML20106B646 + (ML20106B646)
- ML20106B647 + (ML20106B647)
- ML20106B652 + (ML20106B652)
- ML20106B656 + (ML20106B656)
- ML20106B660 + (ML20106B660)
- ML20106B661 + (ML20106B661)
- LD-92-099, Advises That Vendor in Process of Developing Tier 1 Design Descriptions & Accompanying ITAAC for Sys 80+.Proposes Delay in Submittal of ITAAC Submittal Until Package Can Accomodate Guidance from 920826 Meeting in San Jose,Ca + (ML20106B662)
- ML20106B677 + (ML20106B677)
- ELV-04014, Comment in Total Agreement W/Numarc Comments Re Proposed GL, Emergency Response Data Sys Test Program + (ML20106B694)
- ML20106B696 + (ML20106B696)
- ML20106B699 + (ML20106B699)
- ML20106B703 + (ML20106B703)
- ML20106B709 + (ML20106B709)
- ML20106B714 + (ML20106B714)
- ML20106B727 + (ML20106B727)
- 05000251/LER-1984-020-01, :on 840914,redundant Containment Isolation Valve V-4-204 on Svc Air Header Found Open.Cause Unstated. Valve Closed & Lock for Valve Relocated to Valve Handle + (ML20106B755)
- ST-HL-AE-4167, Forwards Rev 1 to Station Procedure 0ERP01-ZV-IN01, Emergency Classification to Clarify Areas of Emergency Action Level Tables + (ML20106B765)
- ML20106B768 + (ML20106B768)
- ML20106B775 + (ML20106B775)
- ML20106B782 + (ML20106B782)
- 05000373/LER-1984-056-01, :on 840921,primary Containment Isolation Sys Group I Isolation Resulted in Reactor Scram During MSIV Test.Caused by Accidental Bumping of Pressure Switch.Sign Warning Personnel Re Switches Posted + (ML20106B785)
- 05000328/LER-1984-018-02, :on 840910,three Reactor Trips Occurred.Caused by Steam Generator lo-lo Level.Engineering Design Issued to Consider Westinghouse Design for Automation of Steam Generator Level Control at Low Reactor Power + (ML20106B793)
- JSP-473-92, Forwards Clinton Power Station Ipe,Final Rept, in Response to GL 88-20,Suppl 1, Initiation of IPE for Severe Accident Vulnerabilities. Results Not Significantly Different from Results Reported to NRC During 920520 Meeting + (ML20106B795)
- ML20106B802 + (ML20106B802)
- 3F0884-14, Responds to NRC Re Violations Noted in Insp Rept 50-302/84-20.Corrective Actions:All Pressure Gauges Used in Conjunction W/Filter Regulator Units Recalibr within 1 Wk of NRC Insp + (ML20106B815)
- 05000397/LER-1984-101, :on 840919 & 1002,reactor Water Cleanup Sys Isolated on Spurious Trip Signals (ESF Actuation),Actuating Nuclear Steam Supply Shutoff Sys Div 1 Isolation Relay. Caused Unidentified.Isolation Signal Reset + (ML20106B819)
- ML20106B827 + (ML20106B827)
- ML20106B830 + (ML20106B830)
- ML20106B835 + (ML20106B835)
- ML20106B839 + (ML20106B839)
- ML20106B844 + (ML20106B844)
- 05000338/LER-1984-009-02, :on 840911,motor Driven Fire Pump Removed from Svc Due to Low Discharge Pressure.Caused by Pump Runout Failure of Isolation Butterfly Valve Disk.Recirculation Valve Replaced & Pump Tested + (ML20106B846)
- 05000275/LER-1984-026, :on 840824,moveable in-core Detector Sys Detectors Found Out of Safe Storage Location.Caused by Weakness in Administration & Hardware Controls.Detectors Returned to Concrete Shielding location.w/841012 Ltr + (ML20106B853)