Text
-'
Commonwealth Edison One First National Plaza, Chic-go, Illinois Address Reply to: Post Office Box 767 Chicago. lilinois 60690 s
p August 14, 1984 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
LaSalle County Station Unit 2 Supplement to Response for Inspection Report 50-374/84-23 NRC Docket No. 50-374 4
References (a):
C. E. Norelius letter to Cordell Reed dated July 13, 1984.
(b):
D.L. Farrar letter to J. G.
Keppler dated July 31, 1984.
Dear Mr. Keppler:
This letter provides additional information requested by Mr.
M.
J. Jordan of your staff and supplements the Commonwealth Edison Company response to Inspection Report No. 50-374/84-23 (Reference (b)).
If you have any further questions regarding this matter, please direct them to this office.
Very truly yours, d
D. L.
- arrar, rector of Nuclear Licensing 1m cc:
Resident Inspector - LSCS Attachment 9074N 8410230440 841013 AU6 yrg $
PDR ADOCK 05000374 g
- _Agg, I ~ l.
1 Y
.], '
)
i% s
-: e '.,
, J.
.I
. \\
r-N O
Mgi~
m Y
i I
c h
1 i
m
~
1
- ATTACHMENTS
~'
, c
{p--
a Commonwealth Edison Company-a y'LaSalle_ Unit,2 p
SupplementalLResporise -tio ' Notice of Violation
-l.-
~
s of -
+
. ITEM:FOR?WHICH CLARIFICATION WAS REQUESTED-During'therenforceme.ticonference,.we di'scussed.our concerns
~
n regarding:the system.for managingJsurveillance. t.ests.- specifically,.the-
~
~
controls >over conducting. testing 30n.both e1ectrical-divisions of one system:and onymore'than.one-system: simultaneously. #In;your response
'please describe changes in.your, system for. managing surveillance. testing
.to. preclude recurrence of such violations'.
ADDITIONAL CORRECTIVE-~ ACTION TAKEN TO AVOID-FURTHER NONCOMPLIANCE Unless. required by a pending due or critical date surveillance
~
- 'or another-specific reason simultaneous performance _of two (2) or more_
procedures lon-the.same system'or.more than:one-(1)-system will not-be
~
permitted.
When two.(2) or more procedures must be conducted ~
. simultaneously the Shift Engineer will discuss the precautions and limitations with the shift control room engineer and the unit nuclear
.stationLoperator.
Upon concurrence between these individuals the procedures-can be performed.
'DATE WH'EN FULL ~ COMPLIANCE WILL BE ACHIEVED
~
This item will be. completed by August 31, 1984.
9074N P