ML20106B604
| ML20106B604 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/10/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-30786-TDS, DER-84-09, DER-84-9, NUDOCS 8410230356 | |
| Download: ML20106B604 (2) | |
Text
.
~
p,,:p,,;7 w:
m
- x 1
_. m 3 g
' gegygg -
1 IF.C Arizona Public Service Company 12 OCTy pp S 23 j
'^
N October -10,' ' 1984
- REG! IlVIN-
- a b'
s
- U. L S." Nuclear Regulatory Commission LRegion-V a
Creekside Oaks Office. Park
' '1450 Maria Lane - Suite 210
. Walnut Creek,. California.94596-5368 Attention':' Mr. - T. W. Bishop, Director
. Division-of Resident Reactor Projects and Engineering Programs
~ t
Subject:
- Time Extension For Report - DER 84-09
~ A-50.55(e) Potentially Reportable Deficiency Relating To =
CAD Welding For Cathodic Protection Ground Connection.
Files ;84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between R. Dodds and T. Bradish on February 19, 1984 (B) ANPP-29142,' dated March 23, 1984 (Interim Report)
(C) ANPP-29383, dated April 30, 1984 (Time Extension)
(D)' ANPP-29647, dated June 4,1984 (Time Extension)
(E) ANPP-30060, dated July 27, 1984 (Time Extension)
(F) ANPP-30351, dated August 29,1984 (Time Extension)
(G) ' ANPP-30548, dated September 18, 1984 (Time Extension)
Dear Sir:
^
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (8), and Time Extensions were requested by References (C), (D), (E), (F), and I
(G). At ' that time, it was estimated that a Final Report would be available by October 10, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 30, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yo rs,
%R 84102 356 841010 PDR ADOCK 05000528 E. E. Van Brunt, Jr.
3 PDR APS Vice President Nuclear Production ANPP Project Director 1
EEVB/TRB/nj l
l ces-See-Page Two e g l
ff,n
- gp
-g-D$
n y L
- p. *;
4
'f
~,4
'. Mr. ;T. : W. Bishop -
~
.Page Two ec:
' Richard DeYoung', Director
' Office of -Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- T. G. Woods,' Jr.
D. B. Karner W. E. Ide
- D. B. Fasnacht
'A. C. Rogers L. A. Souza D. E. Fowler l
T. D. Shriver l
C. N. Russo J. Yorees -
J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield l
W. G. Bingham L
R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L.' Clyde M. Woods
- T. J. Bloom Records Center l
Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 l
Atlanta, GA 30339 R
I
\\
y
.s.
_y_m
.,._.,y.y-,,
--,.,,,m,-
y,-m--
- - _ -,, _, ~. - -
,. - ~ -. _ _ _
c
- -,