ML20106B604

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-09 Re Defective CAD Welding for Cathodic Protection Ground Connection.Initially Reported on 840219.Due to Extensive Investigation & Evaluation,Final Rept Delayed Until 841030
ML20106B604
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/10/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30786-TDS, DER-84-09, DER-84-9, NUDOCS 8410230356
Download: ML20106B604 (2)


Text

-

~

p,,:p,,;7 w:

. m -

. - x 1 g

_. m 3  ;-

' gegygg -

. _ _ 1

.. IF.C Arizona Public Service Company

'^

, 12 OCTy pp S 23 j N

, October -10,' ' 1984 - REG! IlVIN- -a b' ANPP-30786-TDS/TRB j '

., s

U. L S." Nuclear Regulatory Commission LRegion-V . _. ,

a Creekside Oaks Office. Park '

' '1450 Maria Lane - Suite 210

. Walnut Creek,. California .94596-5368 ,

Attention':' Mr. - T. W. Bishop, Director

. Division-of Resident .

Reactor Projects and Engineering Programs ~t

Subject:

- Time Extension For Report - DER 84-09

_ ~ A-50.55(e) Potentially Reportable Deficiency Relating To =

Files ;84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between R. Dodds and T. Bradish on '

February 19, 1984 (B) ANPP-29142,' dated March 23, 1984 (Interim Report) '

(C) ANPP-29383, dated April 30, 1984 (Time Extension)

(D)' ANPP-29647, dated June 4,1984 (Time Extension) *

(E) ANPP-30060, dated July 27, 1984 (Time Extension)

(F) ANPP-30351, dated August 29,1984 (Time Extension) ,

(G) ' ANPP-30548, dated September 18, 1984 (Time Extension)

Dear Sir:

^

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (8), and Time Extensions were requested by References (C), (D), (E), (F), and I (G). At ' that time, it was estimated that a Final Report would be ,

available by October 10, 1984

  • Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 30, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time. ,

Very truly yo rs, .

84102 356 841010

%R PDR ADOCK 05000528 E. E. Van Brunt, Jr.

3 PDR APS Vice President Nuclear Production ANPP Project Director 1 EEVB/TRB/nj l l ces- See-Page Two e g l

- ff ,n l

D$

- n gp -g-y L

p. *; ..

4 f

~,4

~

' . Mr. ;T. : W. Bishop -

DER 84-09

.Page Two ec: ' Richard DeYoung', Director

' Office of -Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

- T. G. Woods,' Jr.

D. B. Karner W. E. Ide

- D. B. Fasnacht

'A. C. Rogers L. A. Souza D. E. Fowler l T. D. Shriver l C. N. Russo J. Yorees -

J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield l W. G. Bingham L R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L.' Clyde

, M. Woods

- T. J. Bloom Records Center Institute of Nuclear Power Operations l

1100 circle 75 Parkway, Suite 1500 l Atlanta, GA 30339 R

I

\

l y - .s. ,.. _ _y_m .,._.,y.y- , , --,.,,,m,- y,-m-- - - _ - , , _ , ~ . - - , . - ~ - . _ _ _ , , c