Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106A684 + (ML20106A684)
- ST-HL-AE-4207, Application for Amends to Licenses NPF-76 & NPF-80,changing TS 6.5.1.2 That Requires That PORC Consist of Six Members Appointed in Writing from Specific Disciplines Including, Engineering,Operations,Health Physics & Qa/Qc + (ML20106A708)
- ML20106A716 + (ML20106A716)
- NLS8400002, Provides Supplemental Response to NRC 840627 Followup Ltr Re Violations Noted in Insp Rept 50-298/84-06.Corrective Action:Presentation to Facility Personnel Re High Radiation Areas Given at 840628 Safety Meeting + (ML20106A718)
- ML20106A721 + (ML20106A721)
- ML20106A736 + (ML20106A736)
- ML20106A745 + (ML20106A745)
- ML20106A763 + (ML20106A763)
- NG-85-0232, NPDES Noncompliance Notification:On 841217,total Suspended Solids Exceeded Limits.Caused by Power Outage at Sewage Treatment Plant on 841128-29 + (ML20106A764)
- ST-HL-AE-4225, Forwards Pages to Be Added to South Texas Project Electric Generating Station Level 2 PRA & IPE, Transmitted Via + (ML20106A767)
- ML20106A768 + (ML20106A768)
- ML20106A769 + (ML20106A769)
- ML20106A772 + (ML20106A772)
- ML20106A774 + (ML20106A774)
- 0CAN088412, NPDES Noncompliance Notification:On 840720,undetermined Quantity of Wastewater Discharged Due to Mechanical Failure of Sanitary Sewage Treatment Sys.Caused by Partial Clogging of One Grinder Pump.Pump Breaker Reset.Commode Repaired + (ML20106A779)
- LD-92-098, Forwards Structural Models for Sys 80+ Seismic Analysis for Nuclear Island & Nuclear Annex,Per Apr 1992 Audit Meeting in Bethesda,Md + (ML20106A802)
- ML20106A806 + (ML20106A806)
- 0CAN018510, Requests Extension Until 850426 for Response to 841218 Request for Addl Info Re 1982 Relief & Safety Valve Tests, Per NUREG-0737,Item II.D.1 + (ML20106A815)
- ML20106A818 + (ML20106A818)
- ML20106A820 + (ML20106A820)
- ML20106A827 + (ML20106A827)
- 0CAN018512, Responds to Generic Ltr 84-24 Re Certification of Compliance of Environ Qualification Program,Per 10CFR50.49. Implementation of Environ Program to Satisfy Requirements Affirmed + (ML20106A832)
- ML20106A836 + (ML20106A836)
- ET-NRC-92-3750, Forwards Proprietary Info in Partial Response to 920721 RAI Re AP600 Testing Program.Encl Withheld (Ref 10CFR9.17(a)(4)). Proprietary Portion of Document Sent to Westinghouse + (ML20106A837)
- ML20106A842 + (ML20106A842)
- ML20106A849 + (ML20106A849)
- ML20106A874 + (ML20106A874)
- ML20106A885 + (ML20106A885)
- RBG-37-509, Provides Response to NRC Bulletin 92-001,Supplement 1 Failure of Thermo-Lag 330 Fire Barrier Sys to Perform Specified Fire Endurance Function. All Barriers Declared Inoperable on 891026 Following Unsuccessful Testing + (ML20106A893)
- ML20106A900 + (ML20106A900)
- ML20106A909 + (ML20106A909)
- ML20106A936 + (ML20106A936)
- ML20106A956 + (ML20106A956)
- ML20106A965 + (ML20106A965)
- ML20106A973 + (ML20106A973)
- ML20106A984 + (ML20106A984)
- ML20106A987 + (ML20106A987)
- HL-2925, Forwards Response to NRC Re Violations Noted in Insp Repts 50-321/92-18 & 50-366/92-18.Corrective Actions: Temporary Mod 2-92-61 Written to Electrically Bypass Temp Switch 2U61-N110B & Valve 1G41-F041 Repacked + (ML20106A989)
- ML20106A990 + (ML20106A990)
- BVY-92-115, Responds to NRC Bulletin 92-001 Supplement 1 Failure of Thermo-Lag Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Temporary Fire Detection Installed + (ML20106A991)
- ML20106A992 + (ML20106A992)
- ML20106A994 + (ML20106A994)
- HL-2923, Forwards Response to GL 92-04, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in BWRs Per 10CFR50.54(f). Walkdown Performed on Instrument Panels & Ref Leg Tubing.No Visible Leakage Indentified + (ML20106A995)
- ST-HL-AE-4050, Application for Amend to License NPF-76,proposing one-time Amend to TS 4.3.4.2 to Extend 40-month Insp Interval for Turbine Valves to Approx 52 Months + (ML20106A996)
- ML20106B006 + (ML20106B006)
- ML20106B018 + (ML20106B018)
- JPN-92-052, Forwards Rev 1 to Ja Fitzpatrick Nuclear Power Plant Colr. Rept Covers Reload 10/Cycle 11 & Contains Operating Limits Applicable to Next Operating Cycle + (ML20106B019)
- ML20106B024 + (ML20106B024)
- 05000352/LER-1985-003-01, :on 850105,nuclear Steam Supply Shutoff Isolation Signal Resulted in Isolation of Reactor Water Cleanup Outboard Valve.Caused by Inadvertent High Differential Flow Signal + (ML20106B027)
- B14247, Responds to Concerns Raised in SG Replacement Project Insp 50-336/92-26 During Wk of 920831 & at 920904 Exit Meeting. RCS Pipe Cutting Chronology & Pipe Stress Analysis Action Plan Encl + (ML20106B028)
- ML20106B032 + (ML20106B032)