Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101P841 + (ML20101P841)
- ML20101P842 + (ML20101P842)
- ML20101P852 + (ML20101P852)
- ML20101P853 + (ML20101P853)
- ML20101P855 + (ML20101P855)
- ML20101P866 + (ML20101P866)
- ML20101P867 + (ML20101P867)
- ML20101P869 + (ML20101P869)
- 05000254/LER-1989-014, :on 890910,determined That Measured,Combined Leakage Rate from All Penetrations & Valves,Excluding Misvs, Exceeded TS Limits.On 890911,MSIV Leaked in Excess of Ts. Valve Seating Surfaces Machined & Lapped + (ML20101P870)
- ML20101P871 + (ML20101P871)
- JAFP-92-0522, Final SPDES Annual Biological Monitoring Rept Ja FitzPatrick Nuclear Power Plant 1991 + (ML20101P877)
- ML20101P883 + (ML20101P883)
- RBG-37-110, Forwards Response to Rev 1 to Generic Ltr 92-01, Reactor Vessel Structural Integrity, Per 10CFR50.60 & 10CFR50.61 & Commitments Made in Response to Generic Ltr 88-11 + (ML20101P891)
- ML20101P893 + (ML20101P893)
- 05000416/LER-1992-011, :on 920608,discovered Possibility of Potential Secondary Containment Bypass Leakage Paths & Control Room Boundary Leakage Paths.On 911009,temporary Shaft Seal Installed in Sgts.Also Reported Per Part 21 + (ML20101P896)
- ML20101P898 + (ML20101P898)
- ML20101P899 + (ML20101P899)
- ML20101P901 + (ML20101P901)
- 05000219/LER-1992-007, :on 920610,reactor Scram Occurred During Reactor Startup.Caused by Failed Bypass Switch.Plant Placed in Cold Shutdown Condition & Both Bypass Switches Replaced + (ML20101P907)
- ML20101P909 + (ML20101P909)
- ML20101P922 + (ML20101P922)
- RBG-42677, Responds to Violations Noted in Insp Rept 50-458/96-06 on 960126-0202.Corrective Actions:During Future outages,186 Elevation of Refueling Floor Will Be Posted as Airborne Radioactivity Area Prior to Movement of Rv Internals + (ML20101P924)
- ML20101P932 + (ML20101P932)
- ST-HL-AE-4267, Forwards Suppl Response to Initial SALP Rept.Informs That Company Determined to Apply Mgt Attention & Resources Required to Reverse Causes of Declining Performance Noted in Rept + (ML20101P933)
- ML20101P936 + (ML20101P936)
- ML20101P944 + (ML20101P944)
- ML20101P973 + (ML20101P973)
- ML20101P979 + (ML20101P979)
- ML20101P980 + (ML20101P980)
- ML20101P985 + (ML20101P985)
- ML20101P987 + (ML20101P987)
- 3F0185-01, Forwards Conceptual Design to Control Complex Dedicated HVAC Cooling Sys for Safe Shutdown Panel,Power Supply & Switchgear,Per 10CFR50 App R,In Response to 830106 Request + (ML20101P990)
- ML20101P992 + (ML20101P992)
- ML20101P995 + (ML20101P995)
- ML20101Q004 + (ML20101Q004)
- ML20101Q006 + (ML20101Q006)
- ML20101Q012 + (ML20101Q012)
- ML20101Q013 + (ML20101Q013)
- L-82-033, Forwards NUREG-0737,Suppl 1 Compliance Submittal,Including Proprietary SAR for Spds,Brunswick Steam Electric Plant Emergency Response Facilities Info Sys, Per Generic Ltr 82-33 & 840222 Order.Sar Withheld (Ref 10CFR2.790) + (ML20101Q018)
- ML20101Q027 + (ML20101Q027)
- ML20101Q029 + (ML20101Q029)
- ML20101Q031 + (ML20101Q031)
- ML20101Q036 + (ML20101Q036)
- ML20101Q037 + (ML20101Q037)
- ML20101Q046 + (ML20101Q046)
- ML20101Q048 + (ML20101Q048)
- ML20101Q056 + (ML20101Q056)
- ML20101Q058 + (ML20101Q058)
- ML20101Q082 + (ML20101Q082)
- ML20101Q086 + (ML20101Q086)
- ML20101Q087 + (ML20101Q087)