Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101G723 + (ML20101G723)
- ML20101G728 + (ML20101G728)
- ML20101G729 + (ML20101G729)
- ML20101G734 + (ML20101G734)
- ML20101G745 + (ML20101G745)
- RBG-19-752, Submits Info Re Estimate of Permanent Local Operating Staff for Facility.Employees Expected to Number Approx 775 W/ Estimated Annual Payroll of $23,000,000.Significant Impact on Operating Staff of Any Sector Not Expected + (ML20101G751)
- ML20101G752 + (ML20101G752)
- ML20101G754 + (ML20101G754)
- ML20101G755 + (ML20101G755)
- ML20101G756 + (ML20101G756)
- ML20101G760 + (ML20101G760)
- ML20101G766 + (ML20101G766)
- ML20101G768 + (ML20101G768)
- ML20101G772 + (ML20101G772)
- ML20101G781 + (ML20101G781)
- 05000254/LER-1996-003, Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure + (ML20101G784)
- 05000254/LER-1996-003-02, :on 960222,unanticipated Start Occurred on Unit 1 Edg.Caused by Inadequate Guidance within Procedure Qcmms 6600-03.Procedure Qcmms 6600-03 Will Be Revised to Clarify Switch Settings + (ML20101G789)
- ML20101G796 + (ML20101G796)
- ML20101G801 + (ML20101G801)
- ML20101G803 + (ML20101G803)
- ML20101G813 + (ML20101G813)
- ML20101G814 + (ML20101G814)
- W3P84-2565, Informs of Change in Schedule for Permanent Emergency Operations Facility (EOF) Completion,Per NUREG-0737,Suppl 1. Completion of EOF Portion of Training Facility Scheduled for 850228 + (ML20101G815)
- ULNRC-03351, Union Electric 1995 Annual Rept + (ML20101G818)
- ML20101G824 + (ML20101G824)
- ML20101G828 + (ML20101G828)
- ML20101G830 + (ML20101G830)
- W3P84-3454, Comments on Proposed Generic Ltr QA Guidance Re ATWS Equipment Not Safety-Related. Proposed Generic Ltr Should Be Withdrawn or Modified to Allow Demonstration of How Util Programs Meet ATWS Rule + (ML20101G831)
- ML20101G835 + (ML20101G835)
- ML20101G841 + (ML20101G841)
- L-84-369, Forwards MCD-138-1 Through MCD-138-4 of Rev 3 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) + (ML20101G842)
- ML20101G852 + (ML20101G852)
- NRC-84-0133, Informs That Operational Constraints at Callaway Plant Hinder Baseline Cable Insp.Insp Will Be Performed at First Plant Outage of Known Duration Greater than 96 H.All Other Provisions of 840202 Commitment Unchanged + (ML20101G854)
- ML20101G860 + (ML20101G860)
- ML20101G861 + (ML20101G861)
- NSD-NRC-96-4664, Forwards Proprietary Rev 0 to WCAP-14601, AP600 Accident Analyses - Evaluation Models. Proprietary Rept Withheld (Ref 10CFR2.790) + (ML20101G868)
- ML20101G870 + (ML20101G870)
- ML20101G875 + (ML20101G875)
- ML20101G879 + (ML20101G879)
- ML20101G883 + (ML20101G883)
- ML20101G884 + (ML20101G884)
- ML20101G885 + (ML20101G885)
- ML20101G889 + (ML20101G889)
- ML20101G891 + (ML20101G891)
- ML20101G895 + (ML20101G895)
- LD-92-075, Advises That Tier 1 Design Info & Insps,Tests,Analyses & Acceptance Criteria Submittal for Sys 80+ Will Be Provided by 921016 + (ML20101G898)
- ML20101G902 + (ML20101G902)
- ML20101G906 + (ML20101G906)
- ML20101G910 + (ML20101G910)
- 3F0692-11, Forwards Info to Resolve Anomalies in NRC Safety Evaluation Transmitted Via Re Inservice Testing Program + (ML20101G911)
- ML20101G912 + (ML20101G912)