ML20101G766

From kanterella
Jump to navigation Jump to search
Forwards Discussion of Major Issues in Advanced BWR TS That Need Resolution Quickly in Order to Keep Review on Schedule
ML20101G766
Person / Time
Site: 05200001
Issue date: 06/15/1992
From: Chambers J
GENERAL ELECTRIC CO.
To: Peter Hearn, Poslusny C
NRC
References
NUDOCS 9206260278
Download: ML20101G766 (3)


Text

JLe t l'; '92 11: Me l G E I D1DiR E:L[*1 1 P.t :

t gj 00l GENixiew Energy ABWR Date 6-6 'W

\\\\rth To Fax No.

1

(;wa Aeoaay

,yec.

a::

Da r c %w -

  • C-l This page plus 2~

page(s)

From A H^1 0M~aub Mais coce 782.

175 Curtner Avence 3

San Jose, CA 95125 Phone (408) 925- 'M 2-FAX (408) 925-1193 or (408) 925 'S87 Subject

&& 7&a u%s i

Message drincara ga 11a wi e Tswa 4s z w= ra,

i R4GatDit t, 48wf. '/].ci. Spacc, Tu;** NU4 73 At bScat ud

/5.,zty GLicut 14 CAMg n kAu 74<. fwa c-i Tisce _

  • T~.G v G ur w

//ayuc *i2E M6ctexic4 L S vJrxan $

    • D e

A 4-C- SY SW.1 bt f Afr17. < Y AS bAV bCS. Ie<bt-Y l4 iV uoL vf.

A "h72LL1 M)c tail $Lr al-ADAtX 41~ *YkL 57&N 3r? 3~gno v

1 N AbLk 7 f%/' JJW"t44 Wsyf /LCw (4 :- bCAUCdd ic4Ll> bl isivoLvha Ash iF Avv oQ4L '((ca tSPCC i W 7).1LtS W//Dfh f ;'3 0Q tjg ? y J V W Uauc.D B 5-ll Q 43'T4+ l/M LY 72 AL !^/ y wwnn war su x au, sw.c o-r -, s,wu srarn 9206260278 920615 ph-PDR ADOCK 05200001 1 A PDR

,JLvi 15 '92 11:?Ndt G E lo:LE# Lt.K,.1 P.2 3 Proposed Discussion items for_ GE/NRC Meeting on ABWR Tech Specs MecharRCal_Syllerns i e 3.1.5 CRD Accumulators Appropriateness of propc. sed spec considering ABWR design differences (i.e., adop: ion of BWR/G LCO, but only portion for Rx at low pressure; accounting for RPS trip on low CRD l charging water header pressuro) 3.4.1 RIPS Operating l Appropriateness of proposed spec consMering ABWI ? sign l differences Impact of RIPS out of service on transient / accident analyses Documentation of supporting analyses 3.5.1 ECCS Operating Companson with DWR/6 i I - Justification of 30-day AOTs I Credit for " realistic" (i.e. Ch.19) analyses "Value" of low pressure vs. high pressure systems Same division vs. different division failures Capability and treatment of ADS function l Documentation of supporting analyses ? W t y 3.6.2.3 RHR Suppression Pool Coohng Tw pducpek l Comparison with BWR/G f ecee r e AM w wt j - Justification of 30 da, ACT p q w h is j Impact on containment analyses g. Credit for "reahstic" (i.e _ Ch.19) analyses t j* Documentation of supporting analyses 4 1

3. 7,1 Ultimate Heat Sink l

Treatment of site specific item in Design Certification i 3 7.2 RCW/RSW System - Operating 4 Comparison with BWH/G System capability relative to supported systems / components j Credit for "rcalistic" (i.e. Ch.19) analyses Documentation of supporting analyses e

= Proposed Discussion items for GE/NRC Meeting on ABWR Tech Specs (continued) 3 L&C Systerns l 3.3,1 HPS Instrumentation i instrumentation trip logic vs. final actuation logic Indefinite AOT for single channel of instrumentation Acceptability and allowable duration of 2-out-of-3 logic at output actuation logic level t Impact on logic ol loss of divisional power and/or essential multiplexing system (EMS) Proposed surveillance intervals ECCS Instrumehtation 3.3.5 4 Same issues as for RPS above , Cascading to affected equipment LCO vs. direct action \\ t 3.3,6 PCIS Instrumentation Same issues as for RPS and ECCS above MSIV logic vs. all other isolation logic \\ Other General issues 1 ) Use and imoact of PRA results i t - Treatment of sharea instruments (e.g., primary table entries by 4 instrument channel vs. function) \\ \\ n I i 0 s _____m _ ___}}