MONTHYEARML20212J2011999-09-30030 September 1999 Safety Evaluation Supporting Transfer of Dl Ownership Interest in PNPP to Ceico ML20212A6881999-08-31031 August 1999 Safety Evaluation Supporting Amend 106 to License NPF-58 ML20207G2741999-06-0707 June 1999 Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in Application ML20206G6451999-05-0303 May 1999 Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp ML20206E2261999-04-29029 April 1999 Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at PNPP & Use of Table IWB-3514 ML20205P4371999-04-15015 April 1999 Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal Binding ML20205G4221999-03-31031 March 1999 Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1 ML20205E0591999-03-26026 March 1999 Safety Evaluation Supporting Amend 105 to License NPF-58 ML20205D6921999-03-26026 March 1999 Safety Evaluation Supporting Amend 104 to License NPF-58 ML20205D3101999-03-26026 March 1999 Safety Evaluation Supporting Amend 103 to License NPF-58 ML20205C3761999-03-26026 March 1999 Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19 ML20204C0711999-03-11011 March 1999 Safety Evaluation Supporting Amend 102 to License NPF-58 ML20207F4361999-03-0303 March 1999 Safety Evaluation Supporting Amend 101 to License NPF-58 ML20207L4881999-02-24024 February 1999 Safety Evaluation Supporting Amend 100 to License NPF-58 ML20203F8381999-02-0808 February 1999 Safety Evaluation Supporting Amend 97 to License NPF-58 ML20203A5961999-02-0202 February 1999 Safety Evaluation Accepting Licensee Proposed Revs to Responsibilities of Plant Operations Review Committee as Described in Chapter 17.2 of USAR ML20203A5211999-01-27027 January 1999 Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS Pumps ML20198R8921999-01-0707 January 1999 SER Accepting Licensee Proposed Amend to TSs to Delete Reference to NRC Policy Re Plant Staff Working Hours & Require Administrative Controls to Limit Working Hours to Be Acceptable ML20198J0031998-12-22022 December 1998 SER Accepting Licensee Response to GL 92-08,ampacity Derating Issues for Perry Nuclear Power Plant,Unit 1 ML20198K9071998-12-21021 December 1998 Safety Evaluation Supporting Amend 96 to License NPF-58 ML20196J4731998-12-0202 December 1998 Safety Evaluation Supporting Amend 95 to License NPF-58 ML20196D2751998-11-23023 November 1998 Safety Evaluation Supporting Amend 94 to License NPF-58 ML20195F6891998-11-0505 November 1998 Safety Evaluation Accepting Proposed Reduction in Commitment in Quality Assurance Program to Remove Radiological Assessor Position ML20153B8221998-09-16016 September 1998 Safety Evaluation Accepting Changes to USAR Section 13.4.3, 17.2.1.3.2.2,17.2.1.3.2.2.3 & App 1A ML20153D0311998-09-15015 September 1998 Safety Evaluation Supporting Amend 93 to License NPF-58 ML20249A1891998-06-11011 June 1998 SER on Moderate Energy Line Pipe Break Criteria for Perry Nuclear Power Plant,Unit 1 & Requests Addl Info to Demonstrate That Plant & FSAR in Compliance W/Staff Position & GDC as Discussed in SER ML20217D2051998-04-20020 April 1998 SER Authorizing Licensee to Use Code Case N-524 Until Such Time as Code Case Included in Future Rev of RG 1.147 ML20216G4711998-03-12012 March 1998 Safety Evaluation Supporting Amend 92 to License NPF-58 ML20216G3901998-03-11011 March 1998 SER on Proposed Merger Between Duquesne Light Co & Allegheny Power Sys,Inc ML20199C0471997-11-0707 November 1997 Safety Evaluation Supporting Amend 91 to License NPF-58 ML20199B2351997-11-0404 November 1997 Safety Evaluation Supporting Amend 90 to License NPF-58 ML20217E2051997-09-24024 September 1997 Safety Evaluation Supporting Amend 89 to License NPF-58 ML20211H6791997-09-18018 September 1997 Safety Evaluation Authorizing Licensees Request for Alternative from Augmented Insp of Reactor Pressure Vessel Circumferential Weld in Plant,Unit 1 ML20217B2601997-09-11011 September 1997 Safety Evaluation Supporting Amend 87 to License NPF-58 ML20211A5881997-09-11011 September 1997 Safety Evaluation Supporting Evaluation of First 10-yr Interval ISI Program Plan Requests for Relief PT-004,PT-005 & PT-006 for Plant,Unit 1 ML20217K9061997-08-12012 August 1997 Safety Evaluation Accepting Plant First 10-yr Interval ISI Program Plan Relief Request PT-007 ML20141C0081997-06-19019 June 1997 Safety Evaluation Approving Merger Agreement Between Centerior Energy Corp & Ohio Edison Co Affecting NPF-58 ML20141L9131997-05-27027 May 1997 Safety Evaluation Accepting Relief Requests for First 10-yr Interval Inservice Insp Program Plan for Plant,Unit 1 ML20147H4211997-04-0101 April 1997 Safety Evaluation Accepting Changes to USAR Sections,Which Continue to Satisfy Criteria of App B of 10CFR50 ML20134D1061997-01-27027 January 1997 Safety Evaluation on Revised EALs for Plant.Proposed EALs Changes Are Consistent W/Guidance in NUMARC/NESP-007,with One Exception,& Meets Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20114E4561996-06-18018 June 1996 Safety Evaluation Supporting Amend 85 to License NPF-58 ML20101G8351996-03-22022 March 1996 Safety Evaluation Supporting Amend 84 to License NPF-58 ML20100R1171996-02-27027 February 1996 Safety Evaluation Supporting Amend 81 to License NPF-58 ML20101G0761996-01-20020 January 1996 Corrected SE Supporting Amend 79 to License NPF-58. Inaccuracies in Description of Changes Has Been Corrected ML20100C8031996-01-19019 January 1996 Safety Evaluation Supporting Amend 78 to License NPF-58 ML20095G0201995-12-0808 December 1995 Safety Evaluation Supporting Amend 76 to License NPF-58 ML20095A5401995-11-29029 November 1995 Safety Evaluation Supporting Amend 75 to License NPF-58 ML20092N0611995-09-26026 September 1995 Safety Evaluation Supporting Amend 73 to License NPF-58 ML20092J1451995-09-15015 September 1995 Safety Evaluation Supporting Amend 72 to License NPF-58 ML20086C1551995-06-27027 June 1995 Safety Evaluation Supporting Amend 70 to License NPF-58 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000440/LER-1999-004, :on 990916,loss of Safety Function Resulted in TS 3.0.3 Entry.Caused by Design Deficiency in Control Complex Architectural Walls.Revised Storm Contingencies Instructions.With1999-10-18018 October 1999
- on 990916,loss of Safety Function Resulted in TS 3.0.3 Entry.Caused by Design Deficiency in Control Complex Architectural Walls.Revised Storm Contingencies Instructions.With
ML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & PNPP QA Program ML20212J2011999-09-30030 September 1999 Safety Evaluation Supporting Transfer of Dl Ownership Interest in PNPP to Ceico PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With 05000440/LER-1999-003-01, :on 990218,post-accident Dose Limits Were Exceeded.Caused by Relief Valve Leakage Outside of Containment.Removed Relief Valve on 990913,by Design Change Package Implemented Under 10CFR50.59.With1999-09-27027 September 1999
- on 990218,post-accident Dose Limits Were Exceeded.Caused by Relief Valve Leakage Outside of Containment.Removed Relief Valve on 990913,by Design Change Package Implemented Under 10CFR50.59.With
PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With ML20212A6881999-08-31031 August 1999 Safety Evaluation Supporting Amend 106 to License NPF-58 PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Perry Npp.With ML20210J3851999-07-28028 July 1999 PNPP - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With ML20196A1951999-06-17017 June 1999 Instrument Drift Analysis ML20207G2741999-06-0707 June 1999 Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in Application PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2393, Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored1999-05-12012 May 1999 Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored ML20206G6451999-05-0303 May 1999 Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With ML20206E2261999-04-29029 April 1999 Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at PNPP & Use of Table IWB-3514 05000440/LER-1999-002-01, :on 990327,RHR a Pump Failed to Start & LCO 3.0.3 Was Entered Due to TS Bases Misinterpretation.Caused by Failed Optical Isolator That Provided Signal to Pump Start Permissive Circuitry.Subject Circuitry Was Replaced1999-04-26026 April 1999
- on 990327,RHR a Pump Failed to Start & LCO 3.0.3 Was Entered Due to TS Bases Misinterpretation.Caused by Failed Optical Isolator That Provided Signal to Pump Start Permissive Circuitry.Subject Circuitry Was Replaced
ML20206D7911999-04-23023 April 1999 Rev 6 to PDB-F0001, COLR for Pnpp Unit 1 Cycle 8,Reload 7 05000440/LER-1999-001-01, :on 990317,discovered That Control Complex Bldg Architectural Walls Were Not Included in Tornado Dp Loading Design.Caused by Failure to Consider Tornado Dp Loads. Compensatory Measures Were Implemented.With1999-04-16016 April 1999
- on 990317,discovered That Control Complex Bldg Architectural Walls Were Not Included in Tornado Dp Loading Design.Caused by Failure to Consider Tornado Dp Loads. Compensatory Measures Were Implemented.With
ML20205P4371999-04-15015 April 1999 Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal Binding ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With ML20205G4221999-03-31031 March 1999 Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1 ML20206D8461999-03-31031 March 1999 Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7 Cycle 8 ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205E0591999-03-26026 March 1999 Safety Evaluation Supporting Amend 105 to License NPF-58 ML20205D3101999-03-26026 March 1999 Safety Evaluation Supporting Amend 103 to License NPF-58 ML20205D6921999-03-26026 March 1999 Safety Evaluation Supporting Amend 104 to License NPF-58 ML20205C3761999-03-26026 March 1999 Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19 ML20204C0711999-03-11011 March 1999 Safety Evaluation Supporting Amend 102 to License NPF-58 ML20207F4361999-03-0303 March 1999 Safety Evaluation Supporting Amend 101 to License NPF-58 PY-CEI-NRR-2369, Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 9902271999-03-0303 March 1999 Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227 PY-CEI-NRR-2372, Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With ML20207L4881999-02-24024 February 1999 Safety Evaluation Supporting Amend 100 to License NPF-58 ML20203F8381999-02-0808 February 1999 Safety Evaluation Supporting Amend 97 to License NPF-58 ML20203A5961999-02-0202 February 1999 Safety Evaluation Accepting Licensee Proposed Revs to Responsibilities of Plant Operations Review Committee as Described in Chapter 17.2 of USAR ML20203A5211999-01-27027 January 1999 Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS Pumps ML20198R8921999-01-0707 January 1999 SER Accepting Licensee Proposed Amend to TSs to Delete Reference to NRC Policy Re Plant Staff Working Hours & Require Administrative Controls to Limit Working Hours to Be Acceptable ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 PY-CEI-NRR-2356, Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With ML20198J0031998-12-22022 December 1998 SER Accepting Licensee Response to GL 92-08,ampacity Derating Issues for Perry Nuclear Power Plant,Unit 1 ML20198K9071998-12-21021 December 1998 Safety Evaluation Supporting Amend 96 to License NPF-58 ML20196J4731998-12-0202 December 1998 Safety Evaluation Supporting Amend 95 to License NPF-58 PY-CEI-NRR-2346, Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With ML20196D2751998-11-23023 November 1998 Safety Evaluation Supporting Amend 94 to License NPF-58 ML20195F6891998-11-0505 November 1998 Safety Evaluation Accepting Proposed Reduction in Commitment in Quality Assurance Program to Remove Radiological Assessor Position 05000440/LER-1998-003, :on 981001,missed TS SR on H Igniters Was Noted.Caused by Personnel Error.Missed Surveillance Was Performed on Day of Discovery of Item & Function of H Igniters Were Verified.With1998-11-0202 November 1998
- on 981001,missed TS SR on H Igniters Was Noted.Caused by Personnel Error.Missed Surveillance Was Performed on Day of Discovery of Item & Function of H Igniters Were Verified.With
PY-CEI-NRR-2335, Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With 1999-09-30