Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20098B057 + (ML20098B057)
- 05000352/LER-1995-006-01, :on 950828,unusual Event & RPS Actuation Occurred After Reactor Manually Shutdown Due to Leak Into Primary Contaiment & Temporary Loss of Normal Startup Level Control Valve.Conducted All Hands Meeting + (ML20098B059)
- ML20098B062 + (ML20098B062)
- ML20098B063 + (ML20098B063)
- 05000374/LER-1995-006, :on 950302,primary Containment Maximum Allowable Leakage Was Exceeded Due to LLRT Failure.Repaired Valves + (ML20098B065)
- 05000366/LER-1995-003-03, :on 950902,reduction in Main Condenser Vacuum Prompted Manual Reactor Shutdown.Vented Waterbox,Returned Cooling Tower to Svc & Briefed Operations Shift Personnel on Event + (ML20098B066)
- ML20098B069 + (ML20098B069)
- ML20098B070 + (ML20098B070)
- ML20098B073 + (ML20098B073)
- LIC-95-0178, Forwards Fort Calhoun Station Performance Indicators Rept, Aug 1995 + (ML20098B074)
- 05000321/LER-1995-005-01, :on 950829,ground on 600-volt Affected HPCI & Rps.Isolated Electrical Ground,Repaired Grounded Component & Moved Power Source of Freight Elevator + (ML20098B076)
- ML20098B077 + (ML20098B077)
- ML20098B078 + (ML20098B078)
- ML20098B079 + (ML20098B079)
- ML20098B080 + (ML20098B080)
- ML20098B084 + (ML20098B084)
- ML20098B085 + (ML20098B085)
- ML20098B087 + (ML20098B087)
- ML20098B091 + (ML20098B091)
- ML20098B094 + (ML20098B094)
- 05000302/LER-1995-015, :on 950830,revised Calculations Lead to non- Conservative EFIC Setpoint That Resulted in Entry in ITS 3.0.3.Caused by Change in Methodology Used by Util Engineering Personnel.Changed EFIC Setpoints + (ML20098B096)
- ML20098B098 + (ML20098B098)
- 3F0995-14, Responds to NRC Re Violation Noted in Insp Rept 50-302/95-13 Re Postulated Fire That Could Result in Makeup Tank Vortexing & 10CFR50,App R Concern.Formal Operability Evaluation Conducted in Accordance w/NOD-14 + (ML20098B099)
- 3F0995-12, Informs of Removal of Control Complex 164 Ft Elevation Thermo-Lag Fire Barrier & That Compensatory Fire Watches No Longer Required,Based on Util Evaluation of Function of Barrier,Fire Hazards & FP Features of Fire Area Boundary + (ML20098B100)
- ML20098B109 + (ML20098B109)
- ML20098B112 + (ML20098B112)
- ML20098B114 + (ML20098B114)
- ML20098B115 + (ML20098B115)
- ML20098B121 + (ML20098B121)
- ML20098B124 + (ML20098B124)
- NRC-95-4565, Forwards Proprietary Rev 1 to WCAP-14292, AP600 Low- Pressure Integral Sys Test at Oregon State Univ Test Analysis Rept, Vol I & Ii.Encl Withheld + (ML20098B127)
- ML20098B129 + (ML20098B129)
- ML20098B132 + (ML20098B132)
- 05000302/LER-1995-016, :on 950831,revised Calculations Lead to non- Conservative EFIC Setpoint That Resulted in Operation Outside Design Basis.Caused by Change in Methodology Used by Util Personnel.Changed EFIC Sys + (ML20098B135)
- B15369, Revises Completion Date of Commitment Made in 950330 Response to NOV Re Mod Associated W/Engineering Work Request (EWR) 3-93-109.Mod Should Be Implemented by 960331 + (ML20098B136)
- 05000331/LER-1995-009, :on 950829,PCIS Groups 2 Through 5 Isolations Occurred Due to EPA Breaker Trip on Undervoltage. Placed Bus on Alternate Power Supply + (ML20098B142)
- ML20098B143 + (ML20098B143)
- ML20098B146 + (ML20098B146)
- ML20098B148 + (ML20098B148)
- ML20098B150 + (ML20098B150)
- ML20098B151 + (ML20098B151)
- HL-5034, Forwards Response to NRC Re Violations Noted in Insp Rept 50-321/95-16.Corrective Actions:Valve Stem Was Replaced,Repaired Bonnet & Valve Guides & Valve Was Packed Correctly + (ML20098B152)
- 2CAN099505, Forwards Response to NRC Questions Re Util 950404 TS Change Request to Allow Latching & Unlatching of CEAs W/Less than 23 Ft of Water Over Top of Irradiated Fuel Assemblies + (ML20098B153)
- ML20098B154 + (ML20098B154)
- BSEP-95-0504, Responds to NRC Re Violations Noted in Insp Rept 50-325/95-10 on 950525.Corrective Actions:Will Develop Refuel Floor Project Implementation Plan + (ML20098B157)
- ML20098B159 + (ML20098B159)
- ML20098B162 + (ML20098B162)
- ML20098B163 + (ML20098B163)
- ML20098B164 + (ML20098B164)
- PY-CEI-NRR-1987, Informs That Centerior Electric Co Should Be Substituted Wherever Nomenclature Newco Appears in 940602 Proposed Amend Submittal Re Proposed Merger of Toed & Clei + (ML20098B173)
- ML20098B174 + (ML20098B174)