Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095H958 + (ML20095H958)
- ML20095H979 + (ML20095H979)
- RBG-42284, Informs That as Discussed W/Nrr During Recent Telcon Re 950817 Proposed Changes to TS Pertaining to Fuel Handling Accident Conditions,Util Will Incorporate Listed Discussion Into TS 3.6.1.2 Bases + (ML20095H982)
- ML20095H985 + (ML20095H985)
- ML20095H991 + (ML20095H991)
- ML20095H999 + (ML20095H999)
- 05000425/LER-1992-003-02, :on 920402,discovered That Unit 2 Had Operated in Condition Prohibited by Ts.Caused by Incorrect Calibration Procedures.Tcp Was Initiated for All Eight Procedures + (ML20095J001)
- RC-95-0318, Monthly Operating Rept for Nov 1995 for VC Summer Nuclear Station + (ML20095J010)
- ELV-03687, Special Rept:On 920331,K1 Relay to Latch in Closed Position & Short Generator Field.Caused by Spring Load Collar Not Fully Returning to Normal Position.Appropriate Procedures Will Be Changed by 920615 to Ensure Collar Is Checked + (ML20095J024)
- 05000277/LER-1992-005, :on 920326,2B Reactor Water Level Reference Leg Condensing Chamber Was Declared Inoperable.Caused by Loss of Inventory in 2B Condensing Chamber.Leaks Were Repaired & Instrument Lines Were Backfilled + (ML20095J034)
- ML20095J040 + (ML20095J040)
- ST-HL-AE-5260, Notifies That Listed Reactor Operators Have Been Reassigned & Will No Longer Serve in Position Requiring License + (ML20095J042)
- ML20095J043 + (ML20095J043)
- BSEP-95-0649, Informs of Withdrawal of Request & Plans to re-examine Need for TS 3.0.4 Exemption to Spec 3/4.8.1.1 as Part of Project for Converting to BWR-4 Improved TS + (ML20095J044)
- ML20095J046 + (ML20095J046)
- ML20095J051 + (ML20095J051)
- NRC-95-4612, Submits Westinghouse Plan & Schedule for Addl Notrump Separate Effects Test Simulations & Addl Notrump Model Assessments + (ML20095J053)
- ML20095J055 + (ML20095J055)
- 05000301/LER-1995-006-01, :on 951125,PORV post-maint Testing Was Not Performed Prior to Establishing Ltop.Caused by Inadequate Control of post-maint Testing.Established TS Compliance by Venting RCS + (ML20095J057)
- ML20095J058 + (ML20095J058)
- B15461, Application for Amend to License DPR-65 Re RT Setpoints + (ML20095J061)
- RBG-42308, Forwards Summary Rept of NOUE Declared at Facility on 951219 Due to Unidentified Drywell Leakage Increase Above TS 3.4.5 Limit of 5.0 Gpm.Leak Secured & NOUE Terminated + (ML20095J065)
- ML20095J067 + (ML20095J067)
- ML20095J073 + (ML20095J073)
- ML20095J094 + (ML20095J094)
- ML20095J099 + (ML20095J099)
- ML20095J103 + (ML20095J103)
- RBG-42305, Interim Special Rept:On 951212,during Two Prestart Air Roll Attempts,Div I EDG Failed to Reach Satisfactory Rotational Speed.Suspected Cause of Unsuccessful Air Rolls Believed to Be Mechanical Malfunction of 4 Air Admission Valve + (ML20095J105)
- ML20095J107 + (ML20095J107)
- 05000306/LER-1992-003-03, :on 920326,auto Start of Motor Driven Auxiliary Feedwater Pump Occurred.Caused by Personnel Error.Procedures Changed to Specify Pump Numbers + (ML20095J108)
- ML20095J112 + (ML20095J112)
- 05000282/LER-1992-005-01, :on 920326,design Basis Reconstitution Effort Identified Condition Outside 10CFR50,App R Requirements. Caused by Potential Circuit Failure Mode Not Recognized During Development.Procedure Revised + (ML20095J113)
- ML20095J114 + (ML20095J114)
- ML20095J120 + (ML20095J120)
- ML20095J125 + (ML20095J125)
- ML20095J130 + (ML20095J130)
- ML20095J132 + (ML20095J132)
- ML20095J135 + (ML20095J135)
- ML20095J138 + (ML20095J138)
- ML20095J148 + (ML20095J148)
- ML20095J153 + (ML20095J153)
- ML20095J154 + (ML20095J154)
- ST-HL-AE-5259, Forwards mark-ups of Proposed Changes to TS 3.10.8,based on Discussions W/Nrc Re Util 950501 Proposed Amend Request to Include Special Test Exception for Allowed Outage of Up to 21 Days Per Cycle for Each Standby Diesel + (ML20095J156)
- ML20095J161 + (ML20095J161)
- 05000373/LER-1995-018-03, :on 951128,1B RPS M/G Set Tripped Resulting in Half Scram Due to Relay failure.1B RPS M/G Set 1C71-S001B-1K Relay Replaced & Normally Energized Model CR120A Relay in M/G Sets 1A,2A & 2B Will Be Replaced + (ML20095J167)
- ML20095J173 + (ML20095J173)
- 05000498/LER-1995-011, :on 951121,determined That Train B CR Makeup & Cleanup Filtration Sys Carbon Filters Had Not Met TS SRs for Period of 14 Days Between 951101-11 Due to Inadequate Design of Deluge Sys.Filters Replaced + (ML20095J174)
- ML20095J175 + (ML20095J175)
- ML20095J183 + (ML20095J183)
- ML20095J185 + (ML20095J185)
- ML20095J189 + (ML20095J189)