ML20095H985

From kanterella
Jump to navigation Jump to search
Tenth Interim Significant Const Deficiency Rept 60 Re Turnover Documentation & Inadequate Hanger Weld Problems T & B.Initially Reported on 840719.Walkdowns & Rework Incomplete.Final Rept Will Be Submitted by 840831
ML20095H985
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/13/1984
From: Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
60, W3K84F-1884, NUDOCS 8408290145
Download: ML20095H985 (2)


Text

bs 4--

I Louisiana P OW E R & LiG H T/Waterford 3 SES/P. O. Box B/Killona, LA 70066 SEuS$dysY$

August 13, 1984 W3K84-1884 Q-3-A35.07.60 Mr. John T. Collins Regional /dministrator, Region IV U. S. Nuclear Regulatory Commission J') /,

_b0N$ Y c

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 1)

}

2bN

REFERENCE:

LP&L letter W3K84-1656 dated July 19, 1984

\\d UI

))

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 60

" Turnover Documentation and Inadequate Hanger Weld Problems T&B" Tenth Intetim Report The above referenced letter indicated submittal of the Final Report to the USNRC on August 10, 1984 At the present time, walkdowns and minor rework are scheduled to be completed in late August 1984. The Final Report is scheduled to be submitted to the USNRC on August 31, 1984.

Very truly yours, V$

1M T. F. Gerrets Corporate Qaality Assurance Manager TFC:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 A

B O

S

,..J Mr.' John T. Collins August.:13, 1984 W3K84-1884

)

Page 2

'1

-cc: -Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. E. L. Blake 1

Shaw, Pittman, Potts & Trowbridge k

1800 M Street, N.W.

Washington, D.C.

20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia

-30339 Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda, Maryland 20814